Lmu Ama54, Renovation Of Building/Laboratory Technology As Part Of The Measure, Gas Connections Must Be Created For The New Laboratory Rooms And Connected To The On-Site Supply. To Supply Other Components, The Supply Lines Through The Conversion Area Must Be Prepared For Later Expansion. Compilation Of Relevant Masses: - 750 M Copper Pipe For Laboratory Gases Up To 5.0 From Dn 10 To Dn 50 - 45 M Stainless Steel Pipe From Dn 32 To Dn 50 - 50 Pieces Of Ball Valves From Dn 10 To Dn 50 - 16 Extraction Points For Compressed Air Or Nitrogen - 120M Dismantling Of Copper Pipes From Dn 10 To Dn 32