The Mühlenbach-Holunderweg Bridge, Built In 1975, Is A Slab Bridge Made Of Reinforced Concrete With A Total Length Of Approx. 8.20 M, A Total Width Of Approx. 3.50 M And A Permissible Total Weight Of 12 T. The Existing Pipe Railings Are Concreted Into The Cornice. The New Railings Should Be Mounted On New Anchor Plates. Galvanized And Coated Railings According To Riz Gel 4 With Railing Ends According To Riz Gel 19.2 With Point Foundations Should Be Installed. The New Railing Height Is 1.30 M, Measured From The Top Edge Of The Cornice. Before Determining The Offer Prices, Precise Knowledge Of All Local Conditions And Contexts Is Required. The Bidder Is Therefore Recommended To Inform Himself By Inspecting The Construction Site, Checking The Access Routes And All Options For Setting Up The Construction Site, The Supply Of Electricity, Water And Everything Else. Additional Demands Resulting From Ignorance Of The Location Cannot Be Taken Into Account Or Reimbursed. Inconsistencies, Errors, Etc. In The Tender Documents Must Be Reported To The Tendering Authority In Writing By The Bidder Before The Submission Date.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88133345
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.