Construction Work – Modernization Of The School Kitchen And Dining Room Spše Plzeň - Construction. This Is A Complete Reconstruction And Modernization Of The Catering Operation Aimed At Reducing Operational And Energy Costs. After The Modernization Of The School Kitchen, The Capacity Is 1400-1500 Meals Per Day, The Capacity Of The Dining Room Will Be Increased To 300 Seats For Boarders, And The Number Of Delivery Points Will Also Increase. Staff Occupancy At Maximum Capacity Will Be 22 Employees Of The Catering Operation + Approx. 15 Students On Practice, While The Facilities For Employees And Apprentices Will Be New After The Reconstruction In The 1St Pp. Correct Production Practice Will Be Ensured By The New Division Of Individual Parts Of The Operation And Work Sections, The Use Of Modern Technologies To Make Work More Efficient, Saving The Operating Costs Of The Catering Operation. Selected Existing Catering Technology Equipment Will Be Expertly Dismantled And Re-Installed In A New Layout After Reconstruction. This Is A Change To The Existing Building With Intervention In The Supporting And Perimeter Structures. It Includes The Replacement Of The Roof Of The Dining Room Or The Roof Of The Elevated Part Of The Building, Including Its Supporting Structures, Is Tied To The Replacement Of Hvac Distribution And Hvac Units. At The Same Time, The Fulfillment Of The Contract Includes The Professional Dismantling Of The Photovoltaic Power Plant Installed On The Existing Roof, Before Dismantling The Existing Roof And After The New Roof Is Professionally Installed On It Again. An Essential Part Of The Performance Of The Contract Is The Gastronomy Technology And The Related Layout And Construction Modifications Of This Part Of The Building, Including The Exchange Of Related Technologies (Vzt, Zti, Ei, Etc.). The Vz Is Not Divided Into Parts, But The Provisions Of §18, Paragraph 3 Of The Zzvz Are Used, Due To The Large Time-Consuming Nature Of The Custom Production Of Bsh Wooden Glued Trusses, Which Require An Advance Of Approximately Three Months Before The Main Construction. In Case Of Use Of Reserved Changes To The Obligation According To § 100, Paragraph 1 Zzvz And § 100, Paragraph 3 Zzvz, The Total Expected Value Of Vz Can Amount To Czk 143,017,768.28 Excluding Vat.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88032282
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.