Sanitary Fixture Installation Work – Siebentäler Therme Sanitary. Dirty Water In The Building Dirty Water Collecting Pipes Are Carried Out In Hd-Pe Plastic Pipes, Including The Device Connection Pipes. Wall And Ceiling Passages Through F90 Areas Are Secured Against Fire Spread With Fire Protection Sleeves Or Fire Protection Insulation. Sanitary Ventilation Above The Roof Is Insulated From Condensation Water. All Drainage Pipes Are Laid On A Free Slope. Connection Points Below The Backwater Level (Ok Street Level) Are Secured Via Wastewater Lifting Systems And Fed To Them Via The Sewer Pipes In The Floor Slab. The Dirty Water From All Showers On The Ground Floor Is Fed To An (Optional) Heat Recovery System Via A Separate Dirty Water Network. Rainwater The Rainwater Drainage Of The Individual Flat Roof Areas Takes Place In The Gravity System And Is Carried Out In The Building. Emergency Drainage Takes Place Via Roof Spouts In The Attic (Architects Service Included). Water Systems The Sanitary Units Including Wash Basins, Toilets, Urinals And Shower Units Will Be Completely Renovated. The Pipes Will Be Replaced And Stainless Steel System Pipes Will Be Used. The Cold Water Pipes Receive Diffusion-Tight Insulation, While The Hot Water And Circulation Pipes Receive Thermal Insulation Made Of Mineral Fiber Mats. Fire Protection Insulation Is Used For Cables That Run Through Fire Protection Sections. Domestic Hot Water Heating The Central Domestic Hot Water Heating System Is Being Replaced. For Hygienic Reasons, A Fresh Water Station Will Be Used In The Future That Generates Hot Water Using The Flow Principle. When Heating Water Using The Flow Principle, The Drinking Water Is Heated Cold (Pwc) Via A Heat Exchanger And Passed On Directly To The Taps. The Primary Energy Required To Heat The Cold Drinking Water (Pwc) To Warm Drinking Water (Pwh) Is Provided On The Heating Side In A Layered Storage Tank/Heating Buffer Storage Tank. Sauna And Outdoor Sauna Garden The Sauna Area On The Ground Floor Will Be Gutted And An Extension Will Be Added. New Experience Showers And A Cooling Area Will Be Installed. The Water Supply Lines Are Being Re-Laid. The Hot Water Is Supplied Via The Electric Water Heater. There Are Outdoor Showers Outside. These Showers Only Run On Cold And Hot Water. Kitchen And Restaurant The Catering Industry Or Kitchen Receives Its Own Hot Water Preparation, Also Using The Flow Principle, For Separate Billing Of Energy Consumption. The System Is Significantly Smaller In Size, But Corresponds Hydraulically/Hygienically To The Description Of Hot Water Preparation In The Bathroom.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 87923872
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.