Structural Shell Work – Advanced Shell Work. Sprinkenhof Gmbh Is Building A Specialized Facility For Children With Special Educational And Psychiatric Care Needs In 22453 Hamburg, Klotzenmoorstieg 4. This Facility Is Being Built On Behalf Of The Social Authority And Will In Future Offer Targeted Support At The Interface Between Youth Welfare And Child And Child Welfare On Around 2,825 M² Gfa Adolescent Psychiatry. A Crescent-Shaped, 2.5-Story Building Complex Is Being Created In A Mixed Construction Made Of Reinforced Concrete, Masonry And A Wooden External Wall Facade. This Houses Rooms For Three Residential Groups, Classrooms, Offices, Social And Therapy Rooms. The Exercise Room And The Technical Area Are Located In The Partial Basement. The 4,746 M² Property Will Be Designed In Such A Way That The Natural Charm Of The Area Is Preserved. A Central Courtyard Serves As A Meeting Place. In The Southern Part Of The Property There Is Space For Play And Leisure Areas. An Adventure Area Will Be Created On One Of The Roofs. In Keeping With The Neighboring Development, Casa Luna Will Be A Very Green, Relaxing Place That Offers The Children Space To Develop And Heal. A Good Urban Climate Will Be Ensured In The Future By Pv Systems, Extensive And Intensive Green Roofs, A Heat Pump As Well As Rainwater Utilization And A Rainwater Retention Trench Measuring Around 108 M³. The List Of Services For The Extended Shell Construction Work Roughly Includes: Construction Site Equipment, Earthworks, Underground Pipes, Drainage, Reinforced Concrete, Masonry, Interior Plastering And Scaffolding Work. Essential Work: Title 1: Construction Road With Natural Stone Gravel Approx. 330M³; Around 3,680 M³ Of Excavation Work; Approx. 1,530 M³ Filling Floors, Construction Drainage And Creation Of Drainage Title 2: Approx. 1,000 M² Perimeter Insulation, Reinforced Concrete Work (In-Situ Concrete And Prefabricated Parts), Masonry Work, Interior Walls 24 Cm Approx. 1,300 M², 11.5 Cm Approx. 1,050 M², Interior Plastering Work, Etc. With Approx. 4,920 M² Of Machine Plastering Q3, Scaffolding Work Including Around 2,330 M² Of Facade Scaffolding, 3 Stair Towers, Various Work Scaffolding Title 3: Construction Of The Drainage System From The Building Including Earthworks With Approx. 80 M Of Rainwater Pipes Below The Building, 110 M Of Pipes And 3 Shafts Outside The Building , Two Rainwater Cisterns Each 14M³ And Approx. 110 M Of Dirty Water Pipes Below The Building, Or 420 M Of Pipes And 7 Shafts Outside The Building. Approximately 80 M Of Underground Heating Pipes, Approximately 160 M Of Drinking Water Pipes, Approximately 600 M Of Empty Pipes In Trenches Including House Entries To Connect The Parts Of The Building Must Be Laid. Approximately 780 M Of Foundation Earth And 300 M Of Ring Earth For The Lightning Protection System. Title 4: Establishment Of Rain Drainage Including Soil Excavation, Pipelines, Approx. 10 Shafts Dn 1000, Installation Of Rw Trenches 108 M³.
|