Construction Work – Zhaw Win Ct, Tl New Building And Replacement Building, Bkp 240-01 Work Group Hlkk/Ga. Delivery And Installation Of: Laboratory Ventilation Systems With Atex Requirements, Gastro Ventilation System With Production Kitchen, Closed Circuit System Kvs-Wrg, Exhaust Gas Chimneys, Storm Ventilation, Mechanical Smoke And Heat Extraction System, Heat Generation With District Heating Transfer Station, Waste Heat Utilization With Waste Heat Pool, Cold Generation With Ammonia Refrigeration Machines, Energy Channel And Long-Distance Lines, Connections To Existing Buildings, Heat/Cold Distribution And Output, Thermoactive Component System Tabs, Technical Cooling Network, Integration Of Power-To-Gas System, Connections For Scientific Equipment And Test Benches. Ga: Bacnet-Based Building Automation Is Also Integrated Into This Work Group, Including The Operating And Management Level For The Entire Area. Future-Oriented Ga Technology With Smart Building, Mqtt And Iot Applications With High Connectivity.
Contact Information
Address
Stampfenbachstrasse 110
Contact No.
+41414325928
Email
thomas.gnauck@bd.zh.ch
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 87732302
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.