Construction Work - Donát Bánki Technical Tech. And Col. Interior Renovation. Implementation Of The Project With Identification Number Rrf-2.2.2-23-2023-00012 Entitled Complex Interior Renovation Of The Building And Workshop Of The Nyíregyházi Szc Bánki Donát Technical College And College. The Planned Construction Activity Is The Complex Interior Renovation Of The Building And Workshop Of The Nyíregyházi Szc Bánki Donát Technical College And College. 4400 Nyíregyháza, Korányi Frigyes U. The Building Complex Located On Property 15. Consists Of A Dormitory, A Kitchen-Dining Area And Parts Of The Building With A School Function. The Current Planning Program Includes A Complete Interior Renovation Of The School Building. The Building Was Built In 1975, Partly With A Basement, Partly On The Ground Floor + 1 Or 2 Floors, And A 7-Floor (+ Basement And Roof Structure) Dormitory Part Is Also Included. The Vertical And Horizontal Support Structure Of The School Is Unváz Pillar + Panel System. There Is A 10 Cm Stone Sponge Ceramic Panel In Front Of The Univáz Wall Panels. During The Interior Renovation Of The Building, All Structural Elements Up To The Supporting Structure Will Be Dismantled. The Floor Layer Order Will Be Rebuilt In Accordance With Todays Requirements, In Accordance With The Appropriate Water, Heat And Sound Insulation Requirements. The Floor Covering Of The Rooms Is Designed According To The Needs Of Use. In The School Building, Partition Walls And Partition Walls Are Typically Made With Plasterboard Coverings That Are Soundproof And Fireproof, And In Wet Rooms Suitable For Moisture Load. All Internal Doors And Windows Will Be Modernized, In Accordance With The Place Of Installation, In Order To Ensure Acoustic, Fire Resistance, High Usability And Escape Route Requirements. The Buildings Entire Building Electrical System Will Be Installed After The Current Demolition. According To The Function Of An Educational Building, High- And Low-Current Systems Are Installed. From A Building Engineering Point Of View, A Complete System Replacement Will Be Built, Including Water Supply, Sewerage, Rainwater Drainage, Heating Installation And Ventilation Installation. The Replacement Of The Entire Fire Alarm System In The School Building Is Justified, With The Creation Of New Fire Section Boundaries. From The Point Of View Of Accessibility, New Barrier-Free Toilets And Washrooms Will Be Created, And A New Elevator Will Be Built. Net Floor Area Of The Part Of The Building Affected By Renovation: 8,634.11 M2 Construction Of Floor Layer: 8,634.11 M2 Construction Of New Plasterboard Partition Walls: 3,653.24 M2 Surface Treatment Of Walls: 8,679.4 M2 Construction Of False Ceiling: 4,943.55 M2 Installation Of External And Internal Windows: 291 Installation Of Elevator : 1 Pc
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 87716436
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.