The Subject Of The Order Is The Replacement Of Ceilings In The Swimming Pool Hall In The Water Park In Tarnowskie Góry. Scope Of Works: 1. Disassembly Of Suspended Coffered Ceilings And Installation Of New Ceilings In Accordance With The Attached Project; Cassette Ceilings Should Be Made Of Structures With Increased C4 Corrosion Resistance And Aluminum Cassettes;2. When Dismantling The Ceiling, You Should Take Into Account The Disassembly And Reassembly Of Ceiling Speakers - 19 Pieces, Cameras - 4 Pieces, Fire Detectors - 10 Pieces, Emergency Lighting Lamps - 103 Pieces. Installation Of New Lighting In Coffered Ceilings - Led Lamps - 49 Pieces In Location Of Existing Lighting Points; Requirements For New Lighting Fixtures: Round Shape With A Diameter Of Approximately 25 Cm; 230V Power Supply; Min. 2000 Lm, Color 4000 K; Ip 444. Construction Of Stretched Ceilings In Accordance With The Attached Design, Including Led Strip Lighting; Led Strips Should Be Made As A Cob Strip, Ip67, The Structure Of Which Allows For Heat Dissipation; Color 4000 K5. Construction Of Suspended Ceilings From Gkb Boards And Painting With Ceramic Paints, In Accordance With The Attached Project6. Removal Of Ceramic Tiles From The Walls Near The Brine Pool And Installation Of Lacobel With Print On The Entire Surface With An Area Of Approximately 34.00 M2; The Print Pattern Will Be Provided By The Investor7. Dismantling Of The Existing Bar In The Swimming Pool Hall, Made Of Solid Brick - Approximately 12.0 M28. Disassembly Of Aluminum Doors 90X200 Cm In The Catering Area And Bricking Up After Dismantling The Opening And Plastering On Both Sides With Cement And Lime Plaster. Requirements For Carrying Out The Works: 1. The Ordering Party Allows Work During The Opening Hours Of The Water Park - 6.00 A.M. - 10.00 P.M.;2. Dusty And Noisy Work Is Prohibited During These Hours.3. Before Starting The Works, The Contractor Will Submit A Work Schedule To The Ordering Party For Its Approval4. Due To The Operation Of The Water Park During The Execution Of The Order, The Ordering Party Divided The Area Covered By The Order Into 5 Zones; The Ordering Party Allows Works To Be Performed Simultaneously In One Zone Or, With The Ordering Partys Consent, In Two Zones (Division Of Zones Visible In The Drawing - Attachment)5. Appropriate Protection Of The Swimming Pool Hall During Works, Enabling Collision-Free Use Of The Swimming Pool Hall
Contact Information
Address
Tarnogórski Ośrodek Sportu I Rekreacji Spółka Z O.O.,Tarnowskie Góry,42-600,Śląskie,Pl228 - Bytomski
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 87680854
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.