Electrical Wiring And Fitting Work – New Fire Station Perleberg-Los 4.04 – High-Voltage Systems. The Following Scope Of Services Is Advertised For Lot 4.04: - Kg 442: The Building Will Receive A 162Kwp Pv System That Will Be Installed On The Free Roof Area. Unused Pv Electricity Is Fed Back Into The Grid. For The Backup Power Supply, An Emergency Power System With 165 Kva Will Be Installed As A Container In The Outdoor Facilities. - Kg 443: The Central Star Point Of The Supply Network Is The Nshv On The Ground Floor Of The Social Wing. The Nshv Contains The Av/Sv Switchover For The Feed-In To The Nea And The Feed-In Point Of The Pv System Including Metering. - Kg 444: Each Usage Unit And Floor Receives Its Own Sub-Distribution. The Building Is Divided Into Three Service Areas: Social Building, Vehicle Hall, Technology. Each Sub-Distribution Is Fed From The Nshv. The Consultation/Training Rooms On The Upper Floor Of The Social Wing Will Have An Underfloor System With Floor Tanks To Ensure A Certain Degree Of Flexibility In Terms Of Equipment And Room Layout. The Building Will Receive A Knx Network To Control The Lighting, Access Gates And Blinds. - Kg 445: The Workplace Guidelines And The Amev Form The Basis For The Lighting Calculation And Specify The Required Illuminance Levels In The Respective Areas. Energy-Saving Led Lights Are Used Throughout The Building. The Majority Of The Lights Are Dali-Capable And Are Controlled Via The In-House Knx Network. - Kg 446: An Insulated Lightning Protection System Is Installed To Protect The Pv System And To Maintain The Separation Distances. (Lightning Protection Class 3) All Electrically Conductive Parts Are Connected To The Foundation Earth.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 87666560
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.