Sewer Cleaning Services – Maintenance And Maintenance Of The Storm Sewerage Network In The Tychy City Commune In 2025. The Nature Of The Ordered Works Will Require: - Cleaning Of Storm Sewers And Manholes, Cutting Out Tree Roots From Storm Sewers, Cleaning And Maintenance Of Sand Traps, Cleaning Of Settling Wells, Cleaning Of Oil Separators And The Evaporation Tank; - Replacement Of Storm Sewage Systems, Renovation Of Storm Sewage Systems Using The Trenchless Method, Construction Of Sewage Manholes, Renovation Of Manholes, Adjustment Of The Height Of Manholes To The Ground Elevation, Reconstruction Of The Surface, Supplementation Or Replacement Of Concrete Or Cast Iron Manholes On Manholes; - Inspections Of Sewage Equipment And The Evaporation Tank, Operational Inspections Of Pre-Treatment Devices; - Plugging The Inlets Of Illegal Connections To The Storm Sewage System, Smoke Formation In The Storm Sewer System, Tv Monitoring Of The Storm Sewer System, Visual Assessment Of Sewage Manholes In Terms Of Connections, Finding Buried Or Asphalted Sewage Manholes In The Field; - Installation Of Non-Return Flaps At Storm Sewage Outlets; - Geodetic Inventory With The Inclusion Of Storm Sewage Sections And Manholes On Basic Maps (In The Event Of Replacement Of Storm Sewage Sections Or Finding Uninvented Sections Of Storm Sewage Systems, Manholes And Other Devices In The Field); - Maintaining Rainwater Pumping Stations And Grates On Sand Traps; - Mowing The Grass In The Area Of The Rainwater Pumping Station, In The Area Of Sand Traps And Outlets; - Issuing Technical Opinions. Each Time Before The Contractor Starts The Work, The Ordering Party Will Specify In The Work Selection Report The Detailed Scope Of Work Together With Their Technology And Completion Date. The Contractor Is Obliged To Ensure 24-Hour Duty And 24-Hour Availability (Readiness) To Take Appropriate Actions To Locate And Secure Reported Failures Within A Maximum Of 1 Hour From Reporting. Reported Interventions Should Be Recorded And Archived. In The Description Of The Subject Of The Order, The Ordering Party Did Not Indicate Any Trademarks, Patents Or Origins, Source Or Specific Process That Characterizes The Products Or Services Provided By A Specific Contractor. The Material Scope Of The Work To Be Performed Is Specified In Annex No. 1A To The Swz.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 87621067
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.