Architectural, Construction, Engineering And Inspection Services – Urban Planning Services. The Sequence Of Streets Referred To Here As The Cathedral Axis Is An Important Route In Hamburgs City Center. It Can Be Seen As The Central Development Axis That Connects The Promenades Of The Binnenalster And Thus The Existing Inner-City Retail Locations (Jungfernstieg, Mönckebergstrasse, Passagenviertel, Etc.) With The Elbe And The Southern Überseequartier In Hafencity. A Coordinated And Overarching Overall Concept Must Be Developed For The Cathedral Axis Itself. The Aim Is To Increase The Attractiveness Of The Cathedral Axis In The Spirit Of The “City Center Action Concept” - “An Attractive City Center For Everyone”. The Task Of The Framework Plan Is To Reconcile The Diverse And Sometimes Competing Objectives And Usage Requirements For The Area Of The Cathedral Axis Or To Create Balanced Balances Between Them And To Create The Basis For Further Long-Term Development With A Convincing And Sustainable Overall Concept. For The Framework Plan, The Architectural, Urban Development, Open Space Planning And Traffic Potential And Developments Should Be Analyzed And Then Converted Into An Overall Vision For The Processing Area. The Completed Framework Plan Is Intended To Represent A Long-Term, Sustainable Development Concept For One Of The Most Important Urban Areas In Downtown Hamburg, Which Will Guide Future Planning Developments In This Area. To Create The Framework Plan, The Contractor Must Combine The Skills Of Architecture, Urban Development And Open Space Planning. The Contractor Must Therefore Put Together A Suitable Team Of Urban Planners, Architects And Open Space Planners Or Landscape Architects. The Contractor Takes Over The Coordination (Project Management) For The Overall Project Framework Plan Cathedral Axis With The Participation Of The Other Contractors For Internal Coordination And Brings Together The Planning Results. Furthermore, He Takes Over The Integration Of The Planning Of The Traffic Planning Service (C) And Coordinates The Interfaces (Content And Time) With The Other Commissioned Contractors, In Particular In Order To Prepare Easily Readable Planning Documents For The Commissioned Contractor Of The Public Participation Service (B) And To Take Part In Public Appointments . The Implementation Of Public Participation (B) And Traffic Planning (C) Themselves Are Not Part Of This Tender - Separate Tenders Will Be Issued For This In Accordance With The Overarching Service Description.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 87616397
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.