Facade Work – Lv 1100 - Facade Work. Delivery And Installation Of Ventilated Facade Cladding Made Of Fiber Concrete Panels (Approx. 1500M²), Multi-Layer Wooden Panels (Approx. 3500M²) And Aluminum Cladding (Approx. 1300M²). Including Insulated And Non-Insulated Substructure Made Of Stainless Steel And Wood. The School And Sports Hall Are Positioned In Such A Way That They Form A Spacious Forecourt To The West. The School Yard Area Will Be Created In Addition To The Existing Protected Forest In The South. The Sports Areas Are In The Rear Part Of The Property, To The East Of The Building. The Outline Of The School Building Is Created By Two Bodies That Merge Into One Another. Circumferential Escape Balconies Connect Both Bodies Into One Building. The Larger, Eastern Part Of The School Building Houses Grades 5-10 As Well As Specialist Classes And Has Two Spacious Inner Courtyards With No Basement. The Administration And Teaching Area As Well As Grades 11-13 Can Be Found In The Eastern Part Of The Building. In Addition To The Spacious Foyer, There Is Space On The Ground Floor For The Slightly Lowered Auditorium, Which Is Classified As A Meeting Place. Under The Auditorium Is The Naturally Ventilated Large Garage With 81 Parking Spaces, Which Is Accessed From The West. The School Building Has A Partial Basement To Accommodate The Technical Systems. The Sports Hall Area Is Also Structurally Connected In The Basement. This Part Of The Building Is Partially Lowered And Includes A Separate Entrance Area, A Triple Gym, A Single Gym And A Two-Story Climbing Room. Due To The Lower Interior Height Of The Single Gymnasium, The Roof Area Of The 4Th Part Of The Hall Will Be Expanded Into A Terrace By Adding An Outside Staircase And Made Usable As A Lounge Area And Grandstand. A Pv System Will Be Installed On The Green Roof Areas Of The Triple Gymnasium And The School Building. The School Building Will Be Constructed In The Basement As A Solid Reinforced Concrete Structure And From The Ground Floor In Hybrid Construction, As A Reinforced Concrete Frame Structure, Filled With Solid Wooden Wall Elements. The Ceiling Components Used Are Predominantly Wood-Concrete Composite Ceilings, Consisting Of Stacked Timber Elements And Top-Up Concrete. The Underside Of The Wooden Elements Receives Acoustic Milling And Remains Visible Later. The Triple Gymnasium Will Be Built Using Solid Construction. The Ceiling Structure Consists Of Bsh Double Panels With Acoustic Trapezoidal Sheet Metal Formwork. The Single Gymnasium Will Be Built Using Pure Reinforced Concrete Solid Construction. Since This Is A Major Construction Project Involving A Large Number Of Different Trades, The Execution Period For This Work Can Be Up To 6 Months Due To Circumstances That The Client Cannot Plan In Advance (E.G. Special Weather Conditions, Delays In The Release Of Plans/Statics, Default/Insolvency Of The Previous Contractor). Extend Without This Leading To Additional Claims For Remuneration On The Part Of The Contractor.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 87613942
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.