Cooling Water Sump Cleaning Work- 1 Desilting of cooling tower sump under foul condition including provision of necessary bamboo scaffolding for safe access for workers to go deep inside the sump with all safety gadgets if required. The job shall includes pumping out of water from well and lifting of mud from the sump only. The collected silt /mud should be stacked for measurement as per the EIC.The party shall arrange all the required tools& tackles for successful execution of work. 2 Mannual carriage of stacked silt/mud from out side of sump within a lead of 100M from the stack point and disposal of the same as per the direction of EIC 3 Hire charges of Hydraulic excavator (3D) with driver and fuel 4 Hire charges of Tipper with driver and fuel 5 Supply of unskilled manpower for cleaning of drain and mud storage area and for other miscelaneous assistance 6 Hire and running charges of loader
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 87575959
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.