Works Related To Water-Distribution Pipelines – Cl7 - Extension And Rehabilitation Of Water Supply And Sewerage Systems In The City Of Vanju Mare And In The Commune Of Vanjulet And Extension And Rehabilitation Of Water Supply Systems In The Commune Of Hinova. Object 1 - Water Supply System Object 1.1 - Vanju Mare Water Supply System Vanju Mare City - Object 1.1.1 - Extension Of The Potable Water Distribution Network With Peid, Pe100, Rc, Pn10, 110 Mm Long Pipes L = 2,906 M Object 1.2 - Vanjulet Water Supply System Vanjulet Location - Object 1.2.1 - Rehabilitation Of Existing Storage Tank With A Capacity Of 750 Mc Object 1.3 - Hinova Water Supply System Hinova Location - Object 1.3.1 - New Station Of Treatment Within The Existing Water Management Q = 3.14 L/S - Object 1.3.2 - Rehabilitation Of The Existing Storage Tank With A Capacity Of 200 Mc Object 1.4 - Bistrita Water Supply System Bistrita Location - Object 1.4.1 - Station New Treatment Within The Existing Water Management Q = 2.88 L/S - Object 1.4.2 - Rehabilitation Of The Existing Storage Tank With A Capacity Of 200 Mc Object 2 - Waste Water System Object 2.1 - Vanjulet Aggregation Vanjulet Location - Object 2.1 .1 - Connections To The Existing Sewage Network, Made Of Pvc Pipes, Dn 160 Mm - 232 Pieces - Object 2.1.2 - Waste Water Pumping Station - 1 Piece Located Within The Existing Treatment Station And The New Water Discharge Pipe Household Waste Including The Discharge Mouth In The Emissary With Peid Pipes, Pn 10, 160 Mm Long, L = 1,902 M Object 2.2 - Vanju Mare Agglomeration Vanju Mare City - Object 2.2.1 - Extension Of The Domestic Sewage Network, With Pipes From Pvc, Sn8, Dn 250 Mm, L= 2,407 M - Object 2.2.2 - Wastewater Pumping Stations - 2 Pieces For All The Investment Objectives Mentioned Above, The Following Activities Will Be Performed: - Construction Works. - Supply And Installation Of Machinery And Technological Equipment. - Testing And Commissioning. - Fixing Any Defects That Appeared During The Minimum 1095-Day Warranty Period. - Training Of The Beneficiarys And/Or Operators Staff. * - Execution Details - The Execution Details For Equipping The Investment Objective With Equipment, Equipment And The Necessary Equipment (Eg: Treatment Plant, Containers, Technologies, Final Disinfection Installations, Sensors And Measuring And Control Equipment, Etc.) In Terms Of The Mechanical And Hydromechanical Installations, The Routes And Diameters Of The Technological Pipes, The Powers Of The Equipment, The Finalization Of The Electrical Schemes And Scada Automation, The Constructive Dimensions Of The Equipment, Platforms And Containers, Etc. Will Be Finalized During Execution By The Contractor In Accordance With The Specifications Of The Manufacturers Of The Purchased Equipment And Subassemblies (According To Hg 907/2016, Annex 10, Chapter C, Letters B) And C)) The Total Duration Of The Contract Is 60 Months: From Which 730 Days (24 Months) Execution, And Minimum 1095 Days (36 Months) Warranty Period. The Estimated Value Of The Contract Does Not Include Amounts Representing Expenses
|