The Subject Of The Order Is The Preparation Of Comprehensive Design And Cost Estimate Documentation For Residential Buildings In The Following Locations: Al. Józefa Piłsudskiego 18, Ul. 3-Go Maja 12, Ul. 3-Go Maja 27, Ul. Hugona Kołłątaja 21, 21A,21B,21C In The Scope Of: A) Replacement Of The Heating Source From Tiled Stoves With Network Heat Along With The Construction Of Individual Rooms Intended For A Heat Exchanger, B) Internal Water And Sewage Installations Of The Buildings, C) Replacement Of The Wlz Electrical Installation And Equipment Buildings With A Fire Protection Switch, D) Together With The Authors Supervision And Obtaining For The Ordering Party All Necessary Arrangements And Permits For The Implementation Of The Task. Task 1: 1. At Al. Józefa Piłsudskiego 18 In Dąbrowa Górnicza. Characteristics Of The Facility: Multi-Family Residential Building. Location: Plot No. 3257, Precinct 0019 Dąbrowa Górnicza I, Id: 246501_1.0019.3257. Usable Area: 605.87 M2. Building With Three Floors. Year Of Construction: Around 1900. The Building Has A Basement, Three Staircases, Built Using Traditional Technology, Made Of Solid Brick, With A Wooden Roof. The Building Is Entered Into The Municipal Register Of Monuments. The Building Is Equipped With Water And Sewage Systems, Electricity And Heating With Coal Stoves.2. At Ul. 3-Go Maja 12 In Dąbrowa Górnicza. Characteristics Of The Facility: Building Consisting Of Residential And Commercial Premises. Location: Plot No. 6655, Precinct 0019 Dąbrowa Górnicza I, Id: 246501_1.0019.6655. Usable Area: Approx. 1,114.27 M2. Building With Two Floors. Year Of Construction: Approx. 1935. The Building Has A Basement Constructed Using Traditional Technology, A Full-Brick Klein Ceiling Made Of Perforated Bricks, A Wooden Roof. The Building Is Equipped With Water And Sewage Installations, Electricity And Heating With Coal Stoves. Scope Of Documentationthe Subject Of The Order Is Comprehensive Documentation Design And Cost Estimate, Which Is To Include At Least: A) Preparation Of Architectural And Construction Designs And Technical Installations (Water And Sewage, Electricity), Central Heating Node. Along With Guidelines For Adapting Rooms For Exchange Rooms - Developed In Accordance With Applicable Regulations - Act Of July 7, 1994 Construction Law (Journal Of Laws 2024.725, Consolidated Text), Regulation Of The Minister Of Development Of September 11, 2020 On The Detailed Scope And Form Construction Design (Journal Of Laws 2022.1679, Consolidated Text), Act Of April 27, 2001 Environmental Protection Law (Journal Of Laws 2024.54, Consolidated Text). Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program (Journal Of Laws 2021.2454) Along With The Necessary Arrangements And Permits. Number Of Copies Of Documents : 3 Sets + 1 Co
|