The Subject Of The Order Is: Demolition Of The Facilities Of The Former Forest Transport Center Base And The Access Ramp In Kaliska In Accordance With The Design Documentation, Demolition Permit Decision, Applicable Regulations, Standards And Technical Conditions For The Execution And Acceptance Of Works, With The Ordering Partys Instructions And The Principles Of Technical Knowledge And Construction Practice. . The Works Cover The Area Of Plot No. 390, Bartel Wielki Registration Area, Kaliska Commune, Starogard Poviat, Where The Facilities Of The Former Otl Base Are Located. The Implementation Will Be Based On The Demolition Permit Decision No. Ab.6741.33.2024 Issued By The Starosta Of Starogard. In Addition, The Scope Of The Order Also Includes The Demolition Of The Access Ramp On Plot No. 387/19, Bartel Wielki Registration District, Kaliska Commune, Starogard Poviat. The Demolition Of The Reinforced Concrete Ramp Will Be Carried Out On The Basis Of Decision No. Ab.6740.5.24.2022, Issued By The Staroste Of Starogard, Regarding The Reconstruction And Expansion Of The Warehouse And Garage Building With A Change Of Use To An Office Building With A Utility Part And The Necessary Technical Infrastructure On Plot No. 387 /19 Rev. Bartel Wielki And 387/13, Kaliska District, Kaliska Commune. The Demolition Concerns Unused Buildings, I.E.: Workshop Building With An Office Part, With A Built-Up Area Of 532 M2, Height 4.5 M, (Brick Office Part With A Basement, Chimney H = 20 M, Reinforced Concrete Workshop Part Without A Basement, With A Broken Rolled Steel Overhead Crane), Water And Sewage Installation, Hardening Of The Area With Concrete Slabs, Central Heating Channel, Road And Square With Road Slabs, Lighting (Reinforced Concrete Poles 10 M High And Cable Installation) And A Fence With A Height Of Approx. .5 M (Made Of Mesh On Steel Posts Encased In Concrete), Reinforced Concrete Ramp With A Length Of Approx. 14 M. Demolition Works Must Be Carried Out In Accordance With All Applicable Occupational Health And Safety Rules And Regulations, Under The Supervision Of A Person With Appropriate Qualifications To Manage Construction Works In The Field Of Construction And Construction. Construction. The Contractor Is Responsible For The Safety Of Persons Performing The Subject Of The Contract. The Ordering Party Does Not Envisage The Recovery Of Demolition Materials. The Contractor May Recover Demolition Materials And Manage Them On His Own In Accordance With Applicable Law. Note Before Demolition Work, Check The Disconnection Of All Utilities, Electricity, Water And Sewage Systems. If It Is Necessary To Isolate The Facilities From All Installations And Secure Them, The Contractor Will Perform Works Within The Scope Of The Subject Of The Contract. The Power Supply Route For The Facilities Located On Plot No. 390, Bartel Wielki Registration District, Kaliska Commune, Runs Through Plot No. 389, Bartel Wielki Registration District, Kaliska Commune, Which Is Th
|