1. The Subject Of The Order Includes The Preparation Of Design Documentation For The Investment Project Entitled: Reconstruction Of Reymonta Street Along With The Authors Supervision.2. As Part Of The Subject Of The Order, The Contractor: A) Prepared A Concept Of Land Development, In Accordance With The Conditions Contained In The Fup - Annex No. 4 To This Swz. B) Will Prepare Complete, Comprehensive, Multi-Discipline Design Documentation Based On The Concept Adopted By The Ordering Party, In Accordance With The Conditions Contained In The Fup – Annex No. 4 To The Swz. The Ordering Party Allows Changes To The Adopted Concept Resulting From The Design Work And Provided That They Are Accepted By The Ordering Party. C) Will Perform All Inventories, Technical Condition Assessments, Vehicle Traffic Intensity Measurements (And Traffic Forecasts), Maps Necessary For The Implementation Of The Investment Task (Investment). Design Purposes, Geotechnical Research Of Soil And Provide Their Results, Determine The Geotechnical Conditions For The Foundation Of Building Structures, Research The Type And Thickness Of Individual Construction Layers Of The Existing Street Surface, And Also Perform Expert Opinions And Tests That, In Accordance With Generally Applicable Legal Regulations, Prove Necessary To Perform A Complete And Comprehensive Design Documentation, And Will Also Allow The Ordering Party To Implement The Investment Task. D) Completed Designs To Remove Any Conflicts With Existing And Planned Land Development Elements, Design For Permanent Change In Traffic Organization, Design For Temporary Change In Traffic Organization (For The Duration Of Construction Works), Bill Of Quantities ( For All Works), Investor Cost Estimates (For All Works), Detailed Technical Specifications For The Execution And Acceptance Of Works (For All Works), E) As Part Of The Preparation Of Design Documentation, The Contractor Will Obtain All Necessary Decisions And Permits, Including: A Decision On A Building Permit Or /I Will Make Effective Construction Reports, Obtain Decisions To Cut Down Trees And Shrubs - If Necessary, Obtain Technical Conditions, Arrangements And Opinions, Permits And Decisions Allowing For Construction Works And Investment Activities In The B Conservation Protection Zone, And Obtain Other Documents Allowing The Ordering Party To Perform The Works Resulting From The Completed Design Documentation. F) Will Be Responsible For Authors Supervision Resulting From The Terms Of The Concluded Contract For The Preparation Of Design Documentation - According To The Template Constituting Annex No. 4 To This Swz And On The Principles Specified In Art. 20 Section 1 Point 4) Act Of July 7, 1994 Construction Law (Journal Of Laws Of 2024, Items 725, 834, 1222) During The Implementation Of All Works Resulting From The Prepared Design Documentation, Within A Period No Longer Than 12 Months From The Date Of Conclusion Of The Contract For The Preparation Of Design Documentatio
|