Electrical Fitting Work – St. Vinzenz Hospital Dinslaken, Conversion Of Gkpn - Electrical And Telecommunications Installation. - Sub-Distribution Av + Sv, Approx. 10 Pieces - It Network Distributor With 6.3 Kva Transformer, Incl. Signaling Panels, Approx. 4 Pieces - Energy Cable Nyy, Nycwy 4 X 16/16 - 4 X 50/25 Mm², Approx. 800 M - Cable In Functional Integrity E90, Nhxh, Nhxch-E90 4 X 16/16 - 4 X 25/16 Mm², Approx. 820 M - Nym Cables 3 X 1.5 - 5 X 4 Mm², Approx. 32,000 M - Med. Intensive Care Rails, Wall Mounting, 3 Sections, 3.40-5.00 M, Approx. 5 Pieces - Bed Supply Units 2-Bed/1-Bed, Vertical, Wall Mounting, Approx. 15 Pieces - Cable Platforms, Parapet Channels, Cable Ladders, Approx. 530 M - Cable Loops, Cable Clips, Cable Carriers, Hermann Clamps, Approx. 4,000 Pieces - Installation Devices. A.P., U.P., Switches, Sockets, Dimmers, Switch Boxes U.P./Cavity Wall, Approx. 3,200 Pieces - Clean Room Lights, Built-In/Surface-Mounted Lights, Downlights, 62.5 Grid Lights, Approx. 480 Pieces - Transmission Networks, Lwl Os2/Om4, Cat7a Duplex, Fire Alarm -, Telecommunications Lines, Approx. 26,000 M - 19 It Cabinets With Accessories Etc., Approx. 3 Pieces - Fiber Optic And Rj45 Cat6a Patch Panels, Approx. 40 Pieces - Data Connection Sockets, Rj45 Keystone Modules Cat6a, Approx. 1,200 Pieces - Patient Call/ Nurse Call System With Call, Cancel, Presence, Pull Buttons, Hallway Displays, Room Signal Lights, Central Technology And Patient Operating Devices, Approx. 450 Pieces - Door And Intercom Stations, Approx. 14 Pieces - Openings In Concrete, Masonry And Plasterboard, Core Drilling, Wall Slots, Approx. 400 Pieces - I30 Fire Protection Ducts Plus Accessories, Cable Routes Crossing Necessary Corridors, Approx. 90 M - Fire Barriers F30-F90 In Gk, Masonry, Concrete Ceilings And Concrete Walls, Box Bulkheads, Approx. 160 Pieces
|