1. The Subject Of The Order Is The Preparation Of Comprehensive Design Documentation, Obtaining Relevant Arrangements And Permits Required By Law And, On Their Basis, The Implementation Of The Task Entitled: Nice, Warmer, Safer - Deep Thermal Modernization Of The Cultural Center In Miłki Consisting Of The Following Modernization Works: The Building Of The Cultural Center – Ul. Szkolna 1B, 11-513 Miłki: • Insulation Of External Walls • Insulation And Waterproofing Of Foundations • Insulation Of The Roof, • Insulation Of The Floor On The Ground, • Replacement Of External Door Joinery, • Replacement Of Window Joinery, • Replacement Of The Heat Source With A Heat Pump, • Replacement Of The Central Heating Installation , For The 45/35°C Low-Temperature System Of The Floor System And Fan Coil Units In The Auditorium, • Execution Of The Domestic Hot Water Installation, • Installation Of Insulation Of The Central Heating System Pipes, • Installation Of Automation To Control The Central Heating System. • Installation Of Mechanical Ventilation With Heat Recovery And Cooling From A Heat Pump In Summer. • Installation Of 20 Kwp Photovoltaic Panels On The Roof Of The Building In The Southern Exposure, Installation On The Ground Is Allowed If The Foundation Conditions Are Favorable. Angle Of Inclination Of The Panels Close To 30 Degrees, Spacing To Prevent The Panels From Being Shaded By Nearby Objects, Strengthening Of The Roof Structure. Replacing The Lighting With Energy-Saving Ones And Equipping It With An Automatic Control System • Other Works Necessary For Thermal Modernization (Replacing Sheet Metal Flashings, Adapting The Roof To Accommodate A Photovoltaic Installation, Replacing Gutters And Downspouts, Etc.)2. The Subject Of The Order Is The Execution Of The Following Scope Of Works In The Design And Build System: 1) Multi-Discipline Design Documentation (In 3 Copies - Construction Design And Executive Designs) For The Task In Question; 2) Obtaining All Necessary Up-To-Date Maps For Design Purposes, Conditions Arrangements;3) Carrying Out All Other Necessary Administrative Procedures Ending With Obtaining A Building Permit (If Required);4) Providing The Ordering Party With 3 Copies Of The Agreed And Accepted Technical Documentation;5) Comprehensive Implementation Of Thermal Modernization Works;6) Carrying Out Control Measurements, Carrying Out Tests Installation, Commissioning And Adjustment Of The Installation (Concerning Central Heating Installations);7) User Training;8) Preparation And Submission To The Ordering Party Of 3 Copies Of As-Built Documentation, Operation And Maintenance Instructions And A Set Of Warranty Cards9) Delivery To The Ordering Party Of 3 Copies Of The Agreed And Approved Technical Documentation, 10) User Training; 11) Preparation Of The Area; 12) Restoration Of The State Before The Commencement Of The Works (I.E. E.G. Filling Holes In The Ground And Restoring The Surface; Restoration Of Greenery; Tidying Up The Area; Othe
Contact Information
Address
Gmina Miłki,Miłki,11-513,Warmińsko-Mazurskie,Pl623 - Ełcki
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 87337199
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.