The Subject Of The Order Is The Performance Of Construction Works Consisting In Improving The Parameters Of Water Drainage Devices (I-Xiv) By Cleaning And Removing Bushes, As Well As The Reconstruction Of 22 Culverts Located In The Towns Of Adamów, Barki, Biesiadki, Nowy Stręczyn, Stary Stręczyn, Zosin, Cyców Commune, Łęczyński Poviat As Part Of Project Consolidation Of Land In The Łęczyński Poviat In The Area Of The Villages Of Adamów, Barki, Biesiadki, Nowy Stręczyn, Stary Stręczyn And Zosin Commune. Cyców From European Union Funds And State Budget Funds Under The Sub-Measure Support For Investments Related To The Development, Modernization And Adaptation Of Agriculture And Forestry Covered By The Agricultural Areas Development Program For 2014-2020 And Funds From The State Treasury. The Subject Of The Order Includes: 1) Works Related To The Reconstruction Of Culverts, Including: A) Preparatory Works, Dismantling Of Culverts Made Of Reinforced Concrete Pipes, Dismantling Of The Front Walls Of The Culverts, B) Earthworks, Mechanical Excavation In Soil Of Categories I-Vi With The Transport Of Excavated Material And Its Management /Disposal, Construction Of Embankments, C) Finishing Works, Strengthening Of Slopes, Ditches And Sewage, Laying Pp Pipe Culverts With A Diameter Of 60 Cm, 2) Drainage Works, Including: A) Preparation Of The Site For Construction, Removal Of Trees And Bushes , Demolition Of Road Elements, Fences And Culverts, B) Earthworks, Mechanical Excavation In Soil Of Categories I-Vi With Transport Of Excavated Material And Its Management/Disposal, Construction Of Embankments, C) Drainage Of The Road Body, Cleaning Of Drainage Devices (Culverts), Drains Longitudinal, D) Foundation - Construction Of The Bed Mechanically Along With Profiling And Compaction Of The Subsoil, E) Construction Of The Surface From Crushed Aggregate, F) Finishing Works - Strengthening Of Slopes, Ditches And Sewage, Cleaning Of Ditches From Silt With Profiling Of Ditch Slopes, Laying Pipe Culverts. The Entire Scope Of Work Is Included In The Detailed Technical Specification For The Execution And Acceptance Of Road Works, Bill Of Quantities, Technical Documentation - Annex No. 1 To Swz - Documentation. The Components Of The Subject Of The Order Also Include All Works And Services Accompanying The Implementation Of The Works, In Particular: Costs Of Surveying Services, Costs Obtaining The Necessary Opinions And Agreements, Water And Electricity Consumption, Construction Insurance, All Preparatory And Cleaning Works, Securing The Construction Site, Maintaining The Construction Facilities, Restoring The Area To Its Original Condition. During The Works, Special Attention Should Be Paid To Properly Securing The Area And Minimizing Nuisance Related To The Works Carried Out. After Completing The Works, The Contractor Is Obliged To Restore Order And Cleanliness In The Area Covered By The Works And To Remove All Construction Remains And Green Waste From The Investment
|