Earthmoving Work – Earthworks And Civil Engineering Work - Schwaigweg 1 / Am Dorfbach 15. Earthworks And Civil Engineering Work - Schwaigweg 1 / Am Dorfbach 15Construction Description:The Property Is Currently Built On With A Residential Stable House That Characterizes The Townscape. The Planned Construction Project Consists Of The Core Renovation Of The Part Of The Building On Area No. 47, As Well As Demolition And Replacement Construction Of The Part Of The Building On Area No. 47/1, Including An Underground Car Park Underneath The New Building With 12 Parking Spaces. The Above-Ground Area Has 3 Floors In A Similar Outline To The Existing One, As Well As A Gallery Floor In The Attic. The Building Is Declared A Community Center By The Municipality Of Ohlstadt And Contains Several Uses: A Generation Meeting Place, Rooms For Events And Clubs, The Tourist Information Office, Public Toilets, A Multifunctional Room For The Community, Three Apartments, And Two Commercial Units Each With A Gallery Level. It Will Assigned To Building Class 3 According To The Bavarian Building Code. The New Building Will Be Constructed As A Wooden Structure With A Wooden Facade. Description Of The Task: The Subject Of The Procurement Is The Demolition And Dismantling Work, Including Security Measures For The Described Construction Project. Description Of The Procurement • Construction Site Equipment, Construction Planning • Construction Of A Construction Fence Including Gate, Maintain, Remove, Approx. 90M • Obtain Permits • Construction Electricity And Construction Water Connection •Documentation•Construction Rubble, Mixed And Unmixed, Approx. 30 Tons In Total•Produce, Maintain, Dismantle Construction Board, 1 Piece.•Produce Open Dewatering•Be Facility, Shoring Work, Equipment•Static Calculation, Measurement Work•Supply, Install, Maintain And Pull Steel Sheet Piles , Approx. 7 To Sheet Piles, Shoring Approx. 84M2•Pull Shoring, Including Building Supports And Embankment Ramp•Demolition Or Dismantling And Disposal, Wooden Trestles, Supporting Existing Walls, Height Approx. 7.90M, 4 Pieces•Demolition Or Dismantling And Disposal, Wooden Trestles, Supporting Existing Walls, Height Approx. 11.30M, 2 Pieces•Demolition Or Dismantling And Disposal, Wooden Trestles, Supporting Existing Walls, Height Approx. 13.87M, 1 Piece•Demolition Of Underpinnings, Broken Concrete, Loading, Transporting, Disposing Of, Approx. 50 To • Demolition Of External Wall, Quarry Wall Stone As A Total Demolition, Including Loading And Disposal, Approx. 300M² • Demolition Of Strip Foundation, Approx. 14.5M³ • Demolition Of Basement Floor Covering, Approx. 16M² • Demolition Of Cellar Walls, Approx. 80M² • Demolition Of Vaulted Ceiling, Approx. 16M² •Demolition Of Basement Light Shaft, 1 Piece•Demolition Of Basement Concrete Stairs, 1 Psch•Declaration And Disposal In Accordance With The Described Positions For Building Rubble/Brick Rubble Rc1 To Rc3, D0 To Dkii•Well Foundation, Concrete Shaft Rings, Up To 3.00M Foundation Depth, Diameter Approx. 1.50M, 14 Pieces•Measuring Construction Pit•Create Search Trench, Secure Divisions And Lines, 4 Pieces.•Excavation Of Topsoil, Homogeneous Area O.1, Approx. 330M3•Excavation Of Soil And Fillings, Homogeneous Area E1, Approx. 850M3•Excavation Of Soil And Gravel, Homogeneous Area E2, Approx. 1,520M3•Additional Rock, Homogeneous Area B2, Approx. 50M3•Form Heaps, 16 Pieces Of Max. 250M3•Store Heaps Temporarily For Sampling, 16 Pieces.•Dis
|