Vocational College Construction Work – Soš Pz Pezinok, Reconstruction Of Dormitory B And Extension Of Building B. The Subject Of The Contract Is The Reconstruction Of The Dormitory B And The Extension Of The Building B In The Premises Of The Pz Pezinok Soš Within The Scope Of The Processed Construction Projects. As Part Of The Work, Work Will Be Carried Out On Individual Objects As Follows: Object No. 1 – Soš Pz Pezinok, Reconstruction Of Dormitory B: As Part Of The Work, Insulation Of The Outer Shell, Insulation Of The Roof Shell, Replacement Of Opening Structures, Replacement Of Lightning Rods, Tinkering Structures And Locksmith Products Will Be Implemented. Part Of The Implementation Will Be New Distribution Systems For Health Technology, Central Heating, Electrical Installation (High Current, Low Current), Hvac. As Part Of Low-Current Distributions, Distributions Will Be Implemented (Electrical Fire Alarm, Voice Fire Alarm, Structured Cabling, Camera System). As Part Of The Reconstruction Of The B Building, The Dn300 Area Sewerage Distribution Will Be Reconstructed, And The Drainage Of Sewage From The Building Will Be Connected To This Reconstructed Sewerage System. Drainage Of Water From The Surface Runoff From Object B /Rainwater From The Reinforced Surfaces Of The Roof/ Is Designed Using An Infiltration Field Consisting Of Infiltration Boxes. The Reconstruction Of The Building Will Also Lead To A Change In The Layout Of The Individual Spaces Of The Building. The Building Is Not Divided Into Building Objects. Object No. 2 – Soš Pz Pezinok, Extension Of Building B: The Purpose Of The Extension Is To Achieve The Required Accommodation Capacity By Expanding The Accommodation Areas, Which Are Necessary For The Reconstruction Of Dormitory B. Part Of The Implementation Will Be New Distribution Systems For Health Technology, Heating, Electrical Installation (High Current, Low Current), Hvac. As Part Of Low-Current Distributions, Distributions Will Be Implemented (Electrical Fire Alarm, Voice Fire Alarm, Structured Cabling, Camera System). The New Layout Of The Extension Of This Accommodation Facility Is Vertically And Communicatively Connected By One Newly Designed New Stairwell And An Operating Personal Elevator. As Part Of The Extension Of Building B, The Buildings On-Site Sewage Distribution Will Be Fed Into The Proposed Dn 300 On-Site Sewer With A Connection To The On-Site Sewer Of The Existing Buildings. Drainage Of Water From The Surface Runoff From The Building /Rainwater From Reinforced Surfaces Of The Roof/ Is Designed Using An Infiltration Field Consisting Of Infiltration Boxes. Construction Works Will Be Carried Out While The Building Is In Operation.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 87254704
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.