The Successful Proponent Will Outline The Team Of Professionals Available To Perform The Followingscope Of Work:A) The Detailed Design Will Be Based On The Preferred Design Of Constructing A Retention Pond(Wet Pond) As Outlined In The Malloy Drain Stormwater Improvements Feasibilityassessment (2023). The Full Scope Of Work Is Not Limited To, But May Encompass Thefollowing: Project Management. Review And Be Familiar With The Existing Reports / Materials Associated With Theproject Including The Following As Listed By Level Of Importance:O Malloy Drain Stormwater Feasibility Assessment (Mpe, 2023)O Phase 2 Preliminary Engineering Report (Mpe, 2015)O Malloy Drain Three Year Project Implementation Plan (Mpe, 2014)O Malloy Drain Project Implementation Plan (Mpe, 2011)O Malloy Drain Master Drainage Plan (Mpe, 2010)O Town Of Coaldale Infrastructure Master Plan (Mpe, 2019) Consult With Key Stakeholders, Such As, But Not Limited To, Alberta Transportationand Atco Gas Prior To Commencing Detailed Design. Detailed Evaluation Of Existing Infrastructure Along Project Extents (Both Highway845 Right-Of-Way And Town’S Right-Of-Way). Coordination Of Shallow Utility Crossings / Realignments / Lowering (As Required). Detailed Design For The New Stormwater Management Facility, Including Maximizingstorage Volume And Other Parameters Identified In The Feasibility Assessment. Overall Design To Be In Accordance With The Following Legislation / Guidelines:O Alberta Environmental Protection And Enhancement Acto Alberta Water Acto Canada Fisheries Acto Current Water Act Approvalo Aepa Standards And Guidelines For Municipal Waterworks, Wastewater,And Storm Drainage Systems - Part 5 Stormwater Management Guidelines Consult With Aepa To Explore Variances From To Recommended Maximum Activestorage Depth And Associated Best Management Principals (Bmps) (As Required). Integrating Stormwater Functionality With Ecological Restorations And Enhancementincluding But Not Limited To:O Subgrade And Finished Gradeso Shoreline And Bed Conditionso Seeding And Planting Of Vegetation Suitable For An Aquatic Environmento Technical Specifications Relating To Environmental Design Elementso Integration With Water Level Control Elements In Outlet Structure Design Thatis Part Of The Conveyance Design. Incorporating Sediment Removal And Promote Water Quality Measures Into Design. Submit A New Registration Application With Aepa, Including Final Design Andcoordinate The Approval Process. Construction Staging Plan With Consideration Of Traffic Impacts And Safety. Detailed Cost And Quantity Estimates. Contracting And Procurement Strategies. Preparation Of Construction, Pre-Qualification, And Tender Documents.B) Provide Contract/Construction Administration And Engineering Services During Constructionof All Work Described Above In Items (A), Which May Include, But Is Not Limited To: Prequalification Evaluation, Administration, And Recommendation. Tender Evaluation, Administration, And Recommendation. Contract Administration. Management Of Construction Budget And Schedule. Ensure Contractor And Consultant Follow Safety Programs. Interpretation Of The Design. Inspections And Materials Quality Assurance Testing As Per Quality Assuranceprogram To Monitor The Quality Control Work Of The Contractor. Review, Approve, And Monitor Traffic Accommodation, Detours, And Erosion Controlplans. Review, Approve, And Monitor Quantities Submitted By The Contractor. Contract Close Out. Record Drawings.Note: The Contractor Bid Documents Will Outline That The Contractor Will Be Responsible To Provideconstruction Surveys. However, The Consultant Will Be Required To Provide The Contractor Withdesign Layout Dwg’S, Grading Surfaces / Alignments, Survey Control (Control Points), And Anyconsultant Surveys For Inspection (Qa).
Contact Information
Contact Person
Mark Boltezar
Address
PO Box 1236#200, 1801 - 20 AveCoaldale, AlbertaT1M 1N1Canada
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 87145086
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.