Cctv Pipeline Survey:Conduct A Cctv Survey Of The Stormwater Pipelines, Ensuring All Major Defects Are Identified, Correctly Coded, And Reported To The Satisfaction Of The Principal. All Digital Data Must Be Compatible With The Principal’S Asset Management System (Techone), Adhering To Its Templates And Naming Conventions.Manhole/Pit Inspections:Perform Thorough Inspections Of Manholes And Pits, Documenting Any Defects Or Issues Observed.Inspection Reporting:Provide Weekly Updates On Progress To The Project Supervisor.Final Reports Must Include (But Not Limited To) Condition Assessments, Data Validation, And Confirmation Of Critical Asset Information (E.G., Dimensions, Invert Levels) Within Required Tolerances.Hydrological Assessment:Conduct An Efficiency Review Of The Existing Stormwater Network Without Considering Current Identified Defects. The Assessment Should Evaluate The Networks Performance Under Typical Hydrological Conditions Including That Of The Arr Guidelines. Flood Studies Have Already Been Conducted And Are Available On The Township Of Wee Waa And Narrabri.Media Files:Supply High-Resolution Media (Video And/Or Images) For All Surveyed Assets, Ensuring Clarity And Detail In Defect Identification.Asset Mapping & Data Capture:Capture And Map Any Unmapped Or Unidentified Assets During The Survey, Updating The Asset Database Accordingly.Gis Capabilities:Ensure All Data And Deliverables Are Compatible With Gis Software For Easy Integration And Analysis.Traffic Management:Provide Traffic Management Services Where Required To Ensure Safe And Efficient Completion Of The Work.
Contact Information
Address
46-48 Maitland StNarrabri, New South Wales 2390Australia
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 87133635
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.