1. The Subject Of The Order Is: Renovation Of Staircases In A Multi-Family Residential Building At Ul. Pietkiewicza 12 In Białystok.2. 2. The Scope Of Construction Works Includes: • Securing Floors With Foil, • Securing Windows And Doors With Foil, • Preparing The Surface, Scraping Off Loose Paint Fragments, Priming, • Repairing Cracks In Walls And Ceilings By Pasting Mesh, • Filling In Gaps With Plaster, • Painting The Wainscoting Twice Oil Paint (Color To Be Agreed With The Ordering Party), • Painting The Remaining Surfaces Of Walls And Ceilings With Emulsion Paint In White, • Painting: Cabinets, Washrooms, Pipes, Ladders, Hatches, Basement Doors, Risers, Concrete Plinths, • Painting Balustrades With Paint Including Replacing The Rubber Handle, • Replacing Ventilation Grilles, • Cleaning The Electrical Installation Equipment Of Switches, Fixtures, Radiators, • Making Numbers On The Doors Of Meter Cabinets, • Washing The Floors And Windows After The Works, • Replacing The Internal Doors, Descent To The Basement (Plate, Smooth In White, White Signboard With Handle Insert Remains Existing).3. Requirements At The Implementation Stage• The Contractor Undertakes To Perform The Work In Accordance With The Submitted Offer, Using Its Own Materials In Accordance With Construction Practice, Applicable Occupational Health And Safety Regulations, Technical Conditions And Based On Polish Standards.• Materials And Products Must Be Used In Accordance With The Approved Documentation To Carry Out The Works. Technical, Approved For Use In Construction, • Organization Of The Construction Site Is The Responsibility Of The Contractor. The Contractor Is Also Responsible For Any Damage Caused By His Activities. • Waste Should Be Stored In Appropriate Containers Provided By The Contractor. Their Removal And Disposal Will Be Carried Out By Specialized Companies With Appropriate Authorizations, At The Contractors Expense. • In The Implementation Process, Efforts Should Be Made To Minimize The Amount Of Waste And To Limit The Amount Of Pollutants Emitted Into The Atmosphere. The Contractor Of The Works Should Also Strive To Minimize Noise That Is Bothersome To The Surroundings, • The Contractor Bears All Responsibility For Securing Equipment And Materials Against Theft, • The Works Should Be Carried Out In Accordance With Occupational Health And Safety And Fire Protection Requirements, • Dangerous Zones On The Construction Site Should Be Appropriately Designated And Marked In Accordance With Applicable Regulations, • After Completing The Works, The Contractor Will Remove All Machines, Devices, Materials And Containers, As Well As Temporary Facilities, From The Construction Site And Leave The Construction Site And Adjacent Areas Tidy.4. Other Requirements Of The Ordering Party. The Works Will Be Carried Out In An Inhabited Building. The Works Should Be Carried Out In Such A Way As To Provide Residents With Access To The Apartments. Works Should Be Carried Out Between 7.00
|