Work Detail
Bridge Construction Work – Replacement New Construction Of The Hirschdorfer Iller Bridge - Bridge And Road Construction Work. Bridge Construction: Earthworks Excavation: Approx. 7,500 M³; Earthwork Installation: Approx. 11,000 M³; Structural Steel (S355 J2w): Approx. 320 T; Reinforcing Steel (B 500 B): Approx. 318 T; Concrete: Approx. 1,800 M³; Foundation With Ft Driven Piles: Approx. 5,900 M; Manufacture Steel Sheet Piling: Approx. 1,650 M²; Road Construction: Expanding Asphalt: Approx. 2,025 M²; Asphalt Base Layer: Approx. 2,500 M²; Asphalt Surface Layer: Approx. 2,500 M²; Supply And Install Antifreeze Gravel: Approx. 2,480 M³; Excavation: Approx. 2,750 M³; Install Floor: Approx. 1,550 M³; Dispose Of Soil: Approx. 2,500 Tons; Topsoil Work: Approx. 1,485 M³; Transport Seepage Pipe Dn 150/Dn 200 Approx. 425 M; Making Shafts: Approx. 16 Pieces; Manufacture Plastic Road Gullies: Approx. 8 Pieces; Deliver And Install Curbs: Approx. 120 M; Deliver And Install One-Liner: Approx. 105 M; Deliver And Install Concrete Ledges: Approx. 105 M; Create Road Markings: Approx. 940 M; Vehicle Restraint Systems (Eco-Safe): Approx. 306 M; Making Steel Railings: Approx. 95 M
Contact Information
Address
Kronenstraße 8
Contact No.
+49 83125256023
Email
vergabestelle@kempten.de
Other Detail
View Original Notice/Document
Download
View Notice Now...
Fill Detail for Getting Instant Access
Instant Access