Construction Work – Totalumbau Junzlen, Los. The Zentralbahn Is Looking For A Contractor In An Open Process To Carry Out The Total Reconstruction Of The Route Between Brienzwiler And Meiringen (Total Reconstruction Junzlen Lot 2, Km 48,278 - Km 50,900). The Work Is Advertised In A Package. The Execution Will Take Place In Two Phases: - Preparatory Work April 2025 - October 2025 - Intensive Phase In Total Closure October 6Th. - November 30Th, 2025 The Main Work Includes: - Total Reconstruction Of The Railway Line Including Dam Elevation, Cable Channels And Drainage 2,600M - New Construction Of Angle Retaining Wall With Prefabricated Elements 2500M - New Construction Of Contact Line Foundations 30 Pieces - Creation Of Wild And Small Animal Crossings: Approx. 50 Pieces Main Quantities: - Excavation 7000 M3 - Gravel Foundation Layer 6500 M3 - Concrete 10500 M3 - Natural Stone Rolling 5600 M3 - Asphalt Surfaces 3500 T - Gravel 8500 M3 - Sleepers 4300 Pieces - Rails 5200 M Special Features: Execution Partially In Total Closure (Intensive Phase) With Multi-Shift Operation. Work In The Area Of Various Protected Areas (Floodplain Area) Additional Track Construction Work In The Perimeter (Optional): - Renewal Of The Liechtenen Track (Track, Sleepers, Ballast And Shoulder Support), Approx. 680 M - Including Replacement Of A Switch The Information On The Planned Work Is A Rough Guideline And Serves Exclusively The Information Intended In The Advance Notice And Have No Binding Meaning.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 87066457
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.