Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Manual Excavation Of Trench With A Depth Of Less Than Or Equal To 1.30 M. Af_02/2021, Slim Concrete Ballast, Applied On Crowning Blocks Or Footings, Thickness Of 5 Cm. Af_08/2017, Reinforced Concrete Fck21, 0Mpa, Machined, Pumped, Densified And Cast, For General Use, With Flat Forms In 12Mm Resin Plywood (05 Uses), Prefabricated Splint, 10 Cm Thick. Af_03/2024, 10/08/2024, Perforated Ceramic Brick Masonry (9X19x19)Cm With Mixed Hydrated Lime Mortar Esp20 Cm, Piled Backfill, Manual Embankment Of Trenches With Clay-Sandy Soil And Mechanized Compaction. Af_05/2016, Perforated Ceramic Brick Masonry (9X19x19)Cm With Mixed Hydrated Lime Mortar Esp.10Cm (1:2:8), Chapisco Applied On Masonry And Internal Concrete Structures, With A Trowel. Mortar Mix 1:3 Prepared In A 400L Concrete Mixer. Af_10/2022, Plaster Or Single Putty In 1:2:8 Mortar, Manual Preparation, Manually Applied To Blind Facade Cloths (Without The Presence Of Gaps), 25 Mm Thickness. Af_09/2022, Lean Concrete For Ballast, Mixture 1:4, 5:4, 5 (In Dry Cement Mass/Medium Sand/Gravel 1) - Mechanical Preparation With 600 L Concrete Mixer. Af_05/2021, Floor In Granilite, Marble Or Granitine For Internal Environments, With A Thickness Of 8 Mm, Including Mixing In A Concrete Mixer, Laying The Joints, Applying The Floor, 4 Polishes With A Polisher, Plastering, Sealer And Wax. Af_06/2022, Wooden Frame Composed Of Slats, Rafters And Purlins For Roofs Of Up To 2 Pitches For Cover-Channel Ceramic Tile, Vertical Transport Included. Af_07/2019, Roofing With Cover-Channel Ceramic Tile, Colonial Type, With Up To 2 Panels, Conventional Plaster Lining (60X60)Cm With Shot And Covered Galvanized Wire - Supply And Assembly, Sheet Iron Door, Frame Type Iron Window Tilting Or Fixed, Installation Of Smooth Colorless Glass, And 4 Mm, In Aluminum Or Pvc Frame, Fixed With Baguette. Af_01/2021_Ps, Electric Point, Material And Execution - Light Point, Circular Ceiling Light, Overlapping, With 12/13 W Led - Supply And Installation. Af_03/2022, Material And Execution - Socket Point, Pvc Power Distribution Board, Built-In, Without Busbar, For 6 Circuit Breakers - Supply And Installation. Af_10/2020, Insulated Flexible Copper Cable, 4 Mm², Flame Retardant 0, 6/1, 0 Kv, For Terminal Circuits - Supply And Installation. Af_03/2023, Plastering With Latex Putty, Wall Application, One Coat, Manual Sanding. Af_04/2023, Manual Application Of Acrylic Sealer Base On Blind Facade Cloths (Without The Presence Of Gaps) Of Multi-Story Buildings. Af_06/2014, Economical Acrylic Latex Paint, Manual Application On Walls, Two Coats. Af_04/2023, Manual Application To Ceiling
|