Junior Construction Civil Engineer With Additional Charges, General Works Supervisor With Additional Charges, Storekeeper With Additional Charges, Storekeeper With Additional Charges, Supply And Placement Of Construction Sign In Galvanized Sheet #26, Esp. 0.45Mm, Dimension (3X1.5)M, Plotted With Vinyl Adhesive, Affixed With 4.8X40mm Rivets, On 20X20mm Metal Structure, Special. 1, 25Mm, Including Support In Autoclaved Eucalyptus Painted With Pva Paint Two (2) Coats, Rental Of Container With Thermal Insulation, Type 1, For Construction Office, With Reference Measurements Of (6) Meters Length, (2, 3) Meters Width And (2, 5) Meters Internal Useful Height, Including Air Conditioning And Internal Electrical Connections, Exclusive Mobilization/Demobilization And External Temporary Connectionslocation Of Container With Thermal Insulation, Exclusive Mobilization/Demobilization And External Temporary Connections, Type 3, For Deposit/Tools Construction, Including Internal Electrical Connections, Excluding Mobilization / Demobilization And External Temporary Connections, Type 4, For Construction Canteen, Type 7, For Construction Changing Room With Four (4) Showers, Three (3) Toilets, One (1) Urinal And One (1) Washbasin, Including Internal Electrical And Hydrosanitary Connections, Mobilization And Demobilization Of Container, Including Loading, Unloading And Transport In Truck Body With Crane (Munck), Exclusive Container Rental, Temporary Water And Sewage Connection To Container ( Construction Office) Temporary Water And Sewage Connection To Container (Construction Office), Manual Demolition Of Ceramic Flooring Or Hydraulic Tile, Including Removal And Stacking, Excluding Demolition Of Subfloor, Transport And Removal Of Demolished Material, Mechanized Demolition Of Concrete, Without Frame, With Electrical Equipment, Exclusive Transport And Removal Of Demolished Materialmechanized Demolition Of Concrete, Exclusive Transport And Removal Of Demolished Material, Mechanized Demolition Of Reinforced Concrete, Exclusive Transport And Removal Of Demolished Materialmechanized Demolition Of Reinforced Concrete, Manual Sanding On Wall To Remove Manual Wall Sanding To Remove Paint, Cleaning Ceramic Or Porcelain Floors Using Neutral Detergent And Manual Brushing. Af_04/2019Cleaning Ceramic Or Porcelain Floors Using Neutral Detergent And Manual Brushing. Af_04/2019, Removal Of Drywall Plates And Profiles, Manually, Without Reuse. Af_09/2023Removal Of Drywall Sheets And Profiles, Without Reuse. Af_09/2023, Manual Removal Of Wooden Frame, With Reuse, Including Removal Of Frame/Screen/Trims, Removal And Stacking, Exclusive Transport And Removal Of Removed Material Not Reusablemanual Removal Of Wooden Frame, Exclusive Transport And Removal Of Removed Material Not Reusable Reusable, Manual Removal Of Marble Or Granite Sill, Exclusive Transport And Removal Of Non-Reusable Removed Materialmanual Removal Of Marble Or Granite Sill, Manual Removal Of Marble Or Granite Sill, Exclusive Transport And Removal Of Non-Reusable Removed Material Marble Or Granite, Window Removal, No Reuse. Af_09/2023Window Removal, Removal Of Ordinary Smooth Glass From Frames Using Aluminum Or Pvc Baguette. Af_01/2021Removing Ordinary Smooth Glass From Frames With Aluminum Or Pvc Baguette. Af_01/2021, Dishes Removal, Without
|