Construction Work – Blücher Kaserne - New Accommodation Building 2 - Heat Supply Systems - Award 2276/2022. Heat Supply Systems - System Technology 1. Heat Generation Systems And Accessories 1.1 Wood Pellet Boiler, Wood Pellet Storage, Pellet Transport, Other - Wood Pellet Boiler (Approx. 450 Kw), 1 Piece - Compressed Air Compressor, 1 Piece - Automatic Ash Removal - Under-Grate Ash Removal - Exhaust Fan, 1 Piece - Electric Filter For Dust, 1 Piece - Pellet Boiler System Control - Pellet Silo, 2 Pieces - Fill Level Measurement Pellet Silo - Pellet Transport - Fuel Supply - Safety Pressure Limiter R1/2 Pn10 - Safety Pressure Limiter R1/2 Pn10 - Water Level Limiter Float Micro Switch - Safety Temperature Limiter Setting Range Up To 120 Degrees C - Immersion Temperature Sensor -10- 120Degreec Pn16 - Immersion Temperature Sensor -10-120Degreec Pn16 1.2 Natural Gas Low Temperature Boiler, 1 Piece - Low Temperature Boiler (Approx. 2,200 Kw), Equipment, Control Cabinet - Burner, Gas Control Module And Holder For Gas Meter Module - Safety Pressure Limiter R1/2 Pn10 - Safety Pressure Limiter R1/2 Pn10 - Water Level Limiter Float Microswitch - Safety Temperature Limiter Setting Range Up To 120 Degrees C - Immersion Temperature Sensor -10-120 Degrees C Pn16 - Immersion Temperature Sensor -10-120 Degrees C Pn16 1.3 Natural Gas Condensing Boiler, 1 Piece - Condensing Boiler (Approx. 1,200 Kw), Equipment, Awt, Control Cabinet - Burner, Gas Control Module And Holder For Gas Meter Module - Safety Pressure Limiter R1/2 Pn10 - Safety Pressure Limiter R1/2 Pn10 - Water Level Limiter Float Micro Switch - Safety Temperature Limiter Setting Range Up To 120 Degrees C - Diving Temperature Sensor -10-120 Degrees C Pn16 - Diving Temperature -Sensor -10-120Degreec Pn16 2. System Peripherals, Pumps, Fittings, Other 2.1. Heating, Other - Heating Pumps, 5 Pieces - Buffer Storage (10 M³), 1 Piece - Membrane Pressure Expansion Vessels, 3 Pieces - Water Treatment System, 1 Piece - Heat Meter (5 Pieces), Gas Meter (2 Pieces) - 3- Directional Control Valves, 3 Pieces - Dirt Traps - Shut-Off Valves, Ball Valves 3. Exhaust System And Accessories, 1 Piece 3.1. Chimney 3.2. Exhaust Connection – Wood Pellet Boiler 3.3. Flue Gas Connection – Low Temperature Boiler 3.4. Exhaust Gas Connection - Condensing Boiler Maintenance Services Are Part Of The Tender - Duration: 4 Years Dates: Start Of Execution: Jan. 2025 Binding Individual Deadline: Oct. 2025 Early Commissioning Of Gas Boiler End Of Execution: Jan. 2026
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 86498104
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.