Building Construction Work - Construction Of A Youth Center In Upi V, Quarter 319, Quarter Zapad 2, Targovishte. Implementation Of The Construction And Installation Works (Smr) Foreseen In The Investment Project, Which Will Be Used To Build A Two-Story Building Of A Youth Center In The Town Of Targovishte, Providing A Modern Material Base For Applying Innovative Approaches To Developing Competencies And Creating A Safe And Motivating Environment For Students And Young People, Supporting Their Pursuit Of Development. With The Project, The Development Indicators For Upi V In Quarter 319 Have Been Reached As Follows: • Area Of The Property - 1750 Sq. M • Built-Up Area - 692 Sq. M • Expanded Built-Up Area - 1184 Sq. M • Building Density - 39% • Building Intensity - 0.6% • Green Area /613 Sq. M/ - 35%, At Least 1/3 Of The Area For Greening Is Occupied By Tall Tree Species, According To Art. 19, Para. 2 Of Ordinance No. 7 Pnut Of 22.12 .2003. The Building Will Be Two-Storey And Will Consist Of A Ground Floor And An Above-Ground Level With Administrative And Domestic Premises And A Reinforced Concrete Roof Slab. On The First Floor, There Is An Entrance Area With Security, A Corridor, A Multifunctional Hall (1) For 100 People + A Dressing Room, A Multifunctional Hall (2) For 30 People, A Multifunctional Hall (3) For 40 People, A Library, A Relaxation Area, A Technical Room, An Auxiliary Room, Sanitary Facilities - Male And Female, Staircase And Elevator. On The Second Floor There Are Administration, Managers Office, Rest Room, Wc, Staff Recreation, Corridor, Playground, Corridor, Utility Room, Bedroom (1) With Three Beds, Bedroom (2) With Three Beds, Bedroom (3) With Three Beds, Bedroom (4) With Three Beds, Bedroom (5) With Three Beds For Disabled People. According To The Project, The Building Is Planned To Be Built Monolithically With Grid Foundations, Brick Walls, Reinforced Concrete Washers, Columns, Slabs And Beams. The External Walls Will Be Built Of 25 Cm Brick Wall And Are Insulated From The Outside With Thermal Insulation Eps - 12 Cm, Mineral Plaster System. Internal Walls Should Be Constructed Of 25 Cm And 12 Cm Brickwork, Plaster, Primer And Latex Or Acoustic Panels With Stone Wool. The Roof Is Intended To Be A Flat, Reinforced Concrete Structure, Insulated With 15 Cm Xps. The Building Is Secured To Absorb Seismic Forces Of The Viii Degree According To Ordinance No. Rd-02-20-2 For The Design Of Buildings And Facilities In Earthquake Areas - 2012. Vertical Communication To All Levels Will Be Carried Out By Means Of A Staircase And One Elevator. It Is Planned That The Staircase Of The Building Will Be A Beam, With A Static Scheme Of A Simple Beam. The Thickness Of The Slide And The Mezzanine Platform Is 18 Cm. The Reinforcement Is One-Way, As Reinforcements Are Placed In The Upper And Lower Parts Of The Slide (Upper Reinforcement). The Foundation Is Solved With Grid Foundations, Loaded With All The Loads With The Corresponding Safety Factors. The Investment Project Deals With The Construction Of Internal Electrical Installation Of The Youth Center, Alley And Facade Lighting. The External Electric Power Supply Of The Get Will Be Implemented With An Lv Cable According To Another Project. The Electrical Installation In The Site Will Be Carried Out According To The Tn-S Connection Scheme, Where Along The Entire Length
|