Construction Work For Dams And Similar Fixed Structures - Reconstruction Of The Dam Ivanyane-2. Execution Of Construction And Assembly Works, According To The Work Project For Reconstruction Of The Ivanyane-2 Dam. The Working Project Contains The Following Parts: Geodesy; Engineering Geology; Hydrotechnical Technological And Constructive; Hydrotechnical - Kis; Fire Safety; Health And Safety Plan; Construction Waste Management Plan; Park Planning And Landscaping; Bill Of Quantities. The Object Is First Category, According To Art. 137, Para. 1, Item 1, Letter E Of The Territorial Planning Act And Ordinance No. 1 On The Nomenclature Of Construction Types. According To Art. 8 Of The Ordinance On The Conditions And Procedures For The Implementation Of The Technical And Safe Operation Of The Dam Walls And The Facilities Attached To Them And For The Implementation Of Control Over Their Technical Condition, The Dam Wall Of The Ivanyane - 2 Dam Is Classified As Follows: Type Of Construction - Gravity Wall, According To Art. 8, Para. 1 Of The Ordinance On Construction Materials And Construction Technology - Earthen Embankment Wall, According To Art. 8, Para. 1 Of The Ordinance On Generalized Parameters - Small Dam Wall According To Icold Classification The Slope Of The Water Slope Is 1:2.5, On The Dry Slope It Is 1:2 And The Crown Width Is 3.50M. Crown Elevation-616.20M. It Is Planned To Build A Reinforced Concrete Spillway With A Fast Flow And An Energy Quencher To Drain The High Water Into The Water Intake, Build A New Main Outlet And A Control And Measurement System (Cms).
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 85985339
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.