Ash Handling System Package For Lara Stpp Stage-Ii 2X800 Mw Ash Handling System Package For Lara Stpp Stage-Ii 2X800 Mw Chhattisgarh , 1.0- Design, Engineering (Including 3D Modelling Of Complete Ahp), Selection Of Equipment Of Complete Ash Handling System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) As Per The Scope Of Specification , 1.1- Design, Engineering, 3D Modelling Of Complete Ahp Including Electrical Buildings In Ahp, Selection Of Equipment Etc Of Complete Ash Handling System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) As Per The Scope Of Specification , 2.0- Manufacturing, Supply, Inspection & Testing, Shop Floor Testing, Shop Floor Painting, Packing & Forwarding, Touch Up Paints, Consumables, Commissioning Spares Etc Of The Following Including Customs Clearance/ Port Clearance. , 2.1- Complete Ash Handling System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) As Per The Scope Of Specification (Except Item Sl. No. 2.2 To 2.6 Below). , 2.2- Complete Wet Bottom Ash Handling System (Mechanical, Civil & Structural, Electrical And C&I Equipment / Items) From Boiler Seal Plate Assembly, Bottom Flange Of Eco, Eco Outlet, Aph And Duct Hoppers To The Bottom Ash Slurry Sumps For Unit #1 & 2 As Per The Scope Of Specification. , 2.3- Complete Dewatering Bin System (Mechanical, Civil & Structural, Electrical And C&I Equipment / Items) From Slurry Dury Knife Gate Valves At Dewatering Bin Top To The Discharge Of Ash To The Mixing Tanks For Unit 1&2 Along With All Associated Equipment At Dewatering Bins As Per The Scope Of Specification. , 2.4- Fly Ash Classification System (Mechanical, Civil & Structural, Electrical And C&I Equipment / Items) At Classifier Silo, Fine Ash & Coarse Ash Hoppers For Unit #1 & 2 As Per The Scope Of Specification. , 2.5- Fly Ash Bagging System (Mechanical, Civil & Structural, Electrical And C&I Equipment / Items) At Fine Fly Ash Silo To Storing At Bagging Shed, Retrieval And Truck Loading For Unit #1 & 2 As Per The Scope Of Specification. , 2.6- Hcsd Pumps For Unit #1 & 2 As Per The Scope Of Specification. , 2.7- Lt Switchgear & Busduct For Ahp , 2.8- Lt Transformers For Ahp , 2.9- Cables- Ht / Lt Power , Screen , Control , Ofc And Communication Cables With All Accessories For Clamping, Jointing & Termination As Per The Scope Specifications , 2.10- Cable Trays, Tray Supports , Earthing & Lightening Protecton Materials, Conduits, Steel For Base Framwes, Hardwares, Illumination System, Ups, Plant Requirements And All Other Electrical And C&I Equipments As Per Scope Matrix, Which Are Not Considered In 2.1 To 2.9Above. , 3.0- Spares-Manufacturing, Supply, Inspection & Testing, Shop Floor Testing, Shop Floor Painting, Packing & Forwarding, Intra Site Handling And Handing Over To End Customer. , 3.1- Mandatory Spares For Complete Ahp As Per As Per The Scope Of Specification ( Other Than Item Mentioned In Sl.No. 3.2 Below ). , 3.2- Mandatory Spares For Lt Switchgear & Busduct For Ahp , Services-Erection & Commissioining,Operation & Maintenance,Training, Unloading,Receipt, Storage Including Intra Site Handling, Painting At Site,Trial Run,Functional Test, Pg Test, Handing Over To End Customer Etc As Per Scope Of Specifications (Price Quoted For Sl.No. 4.1 To 4.11 Shall Be Comprises Of All The Activities) , 4.1- Erection And Commissioning For (Sl. No. 2.1 Above) Complete Ash Handling System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) As Per The Scope Of Specification (Except Sl. No. 2.2 To 2.6 Above). , 4.2- Erection And Commissioning For (Sl. No. 2.2 Above) Complete Wet Bottom Ash Handling System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) From Boiler Seal Plate Assembly, Bottom Flange Of Eco, Eco Outlet, Aph And Duct Hoppers To The Bottom Ash Slurry Sumps For Unit #1 & 2 As Per The Scope Of Specification. , 4.3- Erection And Commissioning For (Sl. No. 2.3 Above) Complete Dewatering Bin System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) From Slurry Dury Knife Gate Valves At Dewatering Bin Top To The Discharge Of Ash To The Mixing Tanks For Unit 1&2 Along With All Asociated Equipments At Dewatering Bins As Per The Scope Of Specification. , 4.4- Erection And Commissioning For (Sl. No. 2.4 Above) Fly Ash Classificatication System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) At Classifier Silo,Fine Ash & Coarse Ash Hoppers For Unit #1 & 2 As Per The Scope Of Specification. , 4.5- Erection And Commissioning For (Sl. No. 2.5 Above) Fly Ash Bagging System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) At Fine Fly Ash Silo To Storing At Bagging Shed, Retrieval And Truck Loading For Unit #1 & 2 As Per The Scope Of Specification. , 4.6- Erection And Commissioning For (Sl. No. 2.6 Above) Hcsd Pumps For Unit #1 & 2 As Per The Scope Of Specification. , 4.7- Erection And Commissioning Of Bhel Free Supplied Items (Cast Basalt Lined Ba & Ca Pipes, Fly Ash Conveying Pipes From Classifier To Hcsd/Fine Fly Ash Silo And Hcsd Seamless Pipes) For Unit #1 & 2 As Per The Scope Of Specification. , 4.8- Erection,Testing , Commissioning & Operation Services For Bhel Supplied Items For Ahp - Ht Motors, Ht Swgr , Ht Transformer, Ups, Charger , Vms , Dcs ,As Per Scope Matrix And Detailed Technical Specification. , 4.9- Erection Testing , Commissioning & Operation Services Of Supply Items In Serial No 2.7, 2.8, 2.9, 2.10 Above. , 4.10- Training Of Employers Perssonel (End User) On Complete Ash Handling System As Defined In The Nit Specification , 4.11- Operation And Maintenace Of Complete Ash Handling Plantas Per The Scope Of Specification. Each Shift Will Be Of Of 8 Hrs Duty. , 5.0- Freight/ Transportation Charges , 5.1- Total Freight/ Transportation Charges For Supply Of All Plant & Equipment Including Spares
|