Roadworks – Design And Execution Of Works For The Objective:,, Construction Of The Bránești Bypass - Dn3 Connection/ C.F.R.-A2 Highway Passage, Municipality Of Bránești, Jud. Ilfov. The Award Of The Contract With The Object Of Design And Execution Of Construction Works For The Objective, Implementation Of Bránești Bypass - Dn3 Connection/ Passage C.F.R.-A2 Highway, Communa Bránești, Jud. Ilfov Will Be Realized Following The Application Of The Open Tender Procedure, Carried Out Entirely By Electronic Means. Brănești Bypass - Dn3 Connection/ C.F.R. Passage - A2 Highway, Brănești Municipality, Jud. Ilfov, By Signing A Contract With A Duration Of: 11 Months, Of Which: - Design Duration - Dtac, Dtoe, Pt+De Phase, - Approval And Authorization - 3 Months From The Date Of Issuance Of The Administrative Order To Start Providing Services, - Duration Execution Of The Works For 8 Months From The Date Of Issuance Of The Administrative Order To Start The Works. Within The Contract, The Following Types Of Works Were Targeted: Connection Road Development Works Between - Passage Cfr And The A2 Motorway; Roundabouts And Intersections Development Works; Lighting Network Arrangement Works; Road Traffic Safety Assurance Works; Rainwater Collection And Directed Evacuation Works; Protection And Relocation Works Led By The Existing Gas; Electrical Network Relocation Works. Arrangement Of Electrical Power Connections For The Proposed Lighting Networks Determining The Estimated Value Of The Contract With The Object Of Execution Of Construction Works For The Objective: ,,Implementation Of Bránești Bypass - Dn3 Connection/ C.F.R.-A2 Highway Passage, Bránești Municipality, Jud. Ilfov Was Carried Out According To The Rules Provided In Chapter I, Section 4 - A, Paragraph 3 Of Law No. 98/2016, With Subsequent Amendments And Additions, Respectively Chapter Ii, Section 2 - A Of The Methodological Norms For The Application Of The Provisions Relating To The Awarding Of The Public Procurement Contract/Framework Agreement From Law No. 98/2016 Regarding Public Procurement, Approved By Gd No. 395/2016, With Subsequent Amendments And Additions, Based On The Sf Developed By A Specialized Company. According To The General Estimate And The Technical-Economic Indicators Approved At The Sf Phase By Cl Branesti, The Estimated Value Of The Contract Is 35,849,487.18 Lei Without Vat, As Follows: 1. Design Services: 515,778.08 Lei Without Vat 3.5.4 Documentation Technical Necessary To Obtain The Approvals/Agreements/Authorizations: 25,000 Lei Without Vat, 3.5.6. Technical Project And Execution Details 406,284.10 Lei Without Vat, 3.8.1. Technical Assistance From The Designer: 84,493.98 Lei Without Vat 2. Execution Of Works: 35,333,709.10 Lei Without Vat 1.3 Arrangements For Environmental Protection And Bringing The Land To Its Original State - 391,200.00 Lei Without Vat 1.4 Expenses For The Relocation/Protection Of Utilities – 9,516,077.54 Lei Without Vat 2 Expenditures For The Provision Of Utilities Necessary For The Investment Objective – 2,962,412.33 Lei Without Vat 4.1 Constructions And Installations – 22,132,038.65 Lei Without Vat 5.1.1 Construction Works And Installations Related To The Organization Of
|