Sewage Work – Design Services, Technical Assistance From The Designer And Execution Of Works For The Cl 15 Contract. Design Services, Technical Assistance From The Designer And Execution Of Works For The Contract Cl 15 - Extension And Refurbishment Of The Lehliu Gara Sewage Treatment Plant. Sludge Drying Installation At The Calarasi Sewage Treatment Plant. Budesti Water Treatment Plant Extension Within The Project Regional Water And Wastewater Infrastructure Development Project For The Area Of Operation Of The Regional Operator In Calarasi And Ialomita Counties, In The Period 2014-2020- Stage Ii, Code Smis 2021 319848 General Objective Of The Contract : Design Services, Technical Assistance From The Designer And Execution Of Works For The Contract Cl 15 - Extension And Refurbishment Of The Lehliu Gara Sewage Treatment Plant. Sludge Drying Installation At The Calarasi Sewage Treatment Plant. Extension Of The Budesti Wastewater Treatment Plant, Aims At The Design And Execution Of Works For The Extension And Rehabilitation Of The Sewage Treatment Plants And The Sludge Drying Installation In The Zonal Water Supply System In Calarasi County, As Follows: - The Design Activities That Refer To The Project Detailed Technical; The Project Will Include, Among Others, All The Necessary Documents (Such As: Memos, Drawings, Calculations, Etc.) For The Elaboration Of The Technical Project In Accordance With The National Legislation And Any Documentation Necessary For Obtaining The Building Permits; - Technical Assistance From The Designer; - Elaboration Of Documentation For Obtaining Isu, Dsp, Environment, Anar, Etc. Operating Authorizations; - Construction Works For The Following Main Sectors: Sector 1. Uat Lehliu Gara - Extension And Refurbishment Of The Waste Water Treatment Plant In The Town Of Lehliu Gara - Extension And Refurbishment Of The Waste Water Treatment Plant In The Town Of Lehliu Gara In Order To Be Able To Treat The Waste Water Coming From An Equivalent Population Of 10995 Pe And Qu Day Max = 1827Mc/Day; The Purification Process Of The Lehliu Gara Station Will Be A Mechano-Biological One With Advanced Purification, The Secondary Step Being An Activated Sludge Purification Process, With The Biological Removal Of Organic Substances Based On Carbon And Nitrogen And The Biological And Chemical Removal Of Phosphorus, With Aerobic Stabilization Of Sludge And Its Treatment And Processing Step. - Purchase: Fully Equipped Laboratory; Fully Equipped Fixed Emergency Generator Set (Including Control Panel And Aar) Sector 2. Uat Calarasi - Sludge Drying Installation At The Sewage Treatment Plant In The Town Of Calarasi - Introduction Of The Sludge Treatment Line Into The Technological Flow Related To The Calarasi Sewage Treatment Plant Of A Sludge Drying Installation That Will Have A Capacity Of Approx. 8753 Mc/Year, Respectively 9238 T/Year; Installation Capacity 1.0 T/H Evaporated Water, Respectively 1.49 T/H Sludge; The Processed Sludge Will Be Dried Up To 90% Su. - Purchase: Sludge Transport Truck To The Drying Plant, For 7 Cubic Meter Containers; Sludge Transport Truck To The Cement Factory, For 20 Cubic Meter Containers Sector 3. Uat Budesti
Contact Information
Contact No.
+40 242312705
Email
achizitii@ecoaqua.ro
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 85664421
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.