This Advert Is Intended To Notify Potential Suppliers Of The Upcoming Combined Tender Including Both The Rushmire Hill Geotechnical Remediation And The Standish Multi-User Path Works. These Two Pieces Of Work Have Been Packaged As A Single Tender.Rushmire Hill Geotechnical Remediationrushmire Hill Is In South Gloucestershire, Near Wotton-Under-Edge, Approximately 1.2 Km South Of Cotswold Edge Golf Course. The Works Are Required To Stabilise The B4058 Carriageway, Which Has Historically Suffered Deterioration From Ground Movement. Remediation Works Will Include Sheet Piling Along The Gcc Owned Verge, Verge And Carriageway Reconstruction. Site Clearance Will Also Be Required To Facilitate The Piling Works. Summary Of Construction Phase Key Deliverables Are As Follows:Site Clearance Including Tree Clearance Over Approx. 255M, 3.5M Width.Sheet Piling Installation Along An Approx. 255M Length Of Verge.Partial Carriageway Reconstruction Of The Northbound Carriageway Over 280M. Carriageway Resurfacing Over Approx. 300Mground Investigation Including The Installation Of 3 No. Inclinometers And 1 No. Slotted Standpipe In The Carriagewaytraffic Management During The Construction Works.Maintain Residents’ Access During The Construction Works.Standish Multi User Paththe Works Are Located Between The Horsemarling Lane Roundabout And Blackbridge Access Track To The South Of Standish, Gloucestershire. This Scheme Is Part Of A Wider Strategic Scheme To Boost Active Travel Provision Within The County, Through The Creation Of The Gloucestershire Cycle Spine And Includes A Section Of Bridle Way. Summary Of Construction Phase Key Deliverables Are As Follows:Construction Of 400M Of 3M Wide New Shared Use Path And Bridal Way150m Of Carriageway Realignment And Works To Splinter Islandstreetlighting Column Installation And Relocation. Columns Will Be Supplied By Gcc.Utility Diversion Works (Pre-Arranged By Gcc For Principal Contractor To Liaise/Accommodate).Drainage Works That Tie-In To Existing Systems And Includes Ditch And Attenuation Pond Construction.Traffic Management During The Construction Works.Maintain Residents’ Access During The Construction Worksgloucestershire County Council Are Seeking A Principal Contractor To Deliver The Construction Phase Of This Project.A Summary Of The Outline Programme For The Combined Packages Of Works Is Shown Below:Tender Period: Thursday 19Th September 2024Award: Monday 25Th November 2024Anticipated Works Start Date: Monday 6Th January 2025Completion: Friday 30Th May 2025Overall Duration: 22 Weeksindicative Value: (£2.2M + £0.44M Vat) = £2.64Mthe Proposed Procurement Route Will Be A Single Stage (Open Procedure) Using The Nec4 Ecc Form Of Contract, Option A Priced Contract With Activity Schedule.Full Details Will Be Available In The Tender Pack That We Intend To Advertise On Thursday 19Th September 2024.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 85592213
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.