1 Preliminary Services 1.1 Work Sign In Galvanized Steel Sheet, 1.2 Full Site Civil Engineer (Hourly), 1.3 Topographical Services For Paving, Including Service Note, Monitoring And Grading (Composition Sinapi/Sc 78472 Of 01/2020 With Update By Incc), 1.4 Cobblestone Removal, 1.5 Loading, Maneuvering And Unloading Of Rubble In A 14 M³ Dump Truck - Loading With Hydraulic Excavator (0.80 M³ / 111 Hp Bucket) And Free Unloading (Unit: T). Af_07/2020, 1.6 Transport With 14 M³ Dump Truck, On Urban Road With Primary Coating (Unit: Txkm). Af_07/2020, 2 Storm Drainage 2.1 Transposition Of Gutter Segments - Tss 01 - Extracted Sand And Produced Crushed Stone, 2.2 Execution Of Machined Concrete Gutter, Molded In Place In A Straight Section, 30 Cm Base X 15 Cm Height. Af_06/2016, 2.3.Mechanized Excavation Of Trench With A Depth Of Up To 1.5 M (Average Upstream And Downstream/One Composition Per Section), Backexcavation. (0.26 M3), Width From 0.8 M To 1.5 M, On 1St Category Soil, Locations With Low Level Of Interference. Af_02/2021, 2.4 Mechanized Trench Backfilling With Backhoe Loader (Retro Bucket Capacity: 0. 26 M³/Power: 88 Hp), 8 To 1, Depth Up To 1, With Soil (Without Replacement) Of 1St Category, With Vibrating Plate . Af_08/2023, 2.5 Loading, Maneuvering And Unloading Soil And Granular Materials In A 14 M³ Dump Truck - Loading With Hydraulic Excavator (1.20 M³ / 155 Hp Bucket) And Free Unloading (Unit: M3). Af_07/2020, 2.6- Transport With 6 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit: M3xkm). Af_07/2020, 2.7. Trench Ballast With Bottom Preparation, Width Less Than 1, With Sand Layer, Manual Launching, In Location With Low Level Of Interference. Af_06/2016, 2.8 - Boca De Lobo Simples - Iron Grill - Blsg 01 - Commercial Sand And Crushed Stone. Rainwater Pipe, 400 Mm Diameter, Joint With Bidim, Installed In Location With Low Level Of Interference - Supply And Installation (Composition Sinapi 95568 Of 10/22), 3Paving3.1Horizontal Excavation In 1St Category Soil With Tracked Tractor (347Hp /Blade: 8, 70M3). Af_07/2020020, 3.2 Regularization And Compaction Of Subgrade Of Predominantly Sandy Soil. Af_11/20199, 3.1.4. Execution And Compaction Of Base And/Or Sub-Base For Simple Graded Crushed Stone Paving - Exclusive Of Loading And Transportation. Af_11/2019, 3.4 Transport With 18 M³ Dump Truck, 3.5 - Guide Laying (Curb) In Straight Section, Made Of Prefabricated Concrete, Dimensions 100X15x13x30 Cm (Length X Lower Base X Upper Base X Height), For Urban Roads (Road Use)..., 3.6Concrete Pavement With Small Equipment - Commercial Sand And Crushed Stone, 3.1.8 Execution Of Contraction Joints For Concrete Pavements. Af_04/2022, 3.8Treatment Of Sawn Joints, With Polyethylene Billet And Silicone-Based Sealant. Af_09/2023, 4.2 - Supply And Implementation Of Galvanized Metal Support For Regulation Plate - D = 0. 60 M, 4 - Signage4.1 - Signage Plate In Steel Sheet Number 16 With Reflective Painting
|