The Contracting Authority Reserves The Right To Divide The Contract Into Individual Parts Among Several Participants. The Contract Is Divided Into 9 Parts Reasonably In Accordance With § 35 Of The Public Procurement Act. The Contract Is Divided Into The Following 9 Parts: 1) Part 1: Colloid Mills And Mixing Equipment 2) Part 2: Fire Roller Shutter 3) Part 3: Air Diaphragm Pumps 4) Part 4: Voc Sensors 5) Part 5: Air Engineering 6) Part 6: Compressed Air Reservoir 7) Part 7: Electrical Installation 8) Part 8: Phase 1 Storage Tank Upgrade 9) Part 9: Phase 2 Storage Tank Upgrade As Part Of This Tender, The Participant Can Therefore Submit An Offer For Any Part Or For Several Parts, Or For All Of These Parts. Within Each Part Of The Contract, The Participant Must Always Be Offered Complete Fulfillment Of The Given Part Of The Contract, In Accordance With The Conditions Of This Procurement Documentation. Each Part Will Be Evaluated Separately. The Subject Of The Performance Of This Order Is The Delivery Of Performance Expected Within The Subsidy Project Investment In Production Innovation In The Company Viktor Lacquers S.R.O. – Supply Of Technologies, Registration Number Cz.01.01.01/02/24_051/0004799. The Technical Parameters Are Set With The Fact That The Contracting Authority Allows Their Modification While Maintaining The Principle That The Power And Range Parameters Are Set As Minimum And The Size And Weight Parameters As Maximum, Unless Something Else Is Stated For A Specific Parameter, With A Tolerance So That The Device Can Be Installed And Connected To The Clients Existing Equipment In The Place Designated For This Equipment. The Supplier Is Responsible For Ensuring That The Order, Or The Given Part Of The Order, Will Be Delivered Complete And Will Contain All Parts Necessary For Flawless Operation. Only Original (Not Refurbished) Components Will Be Used For Production. The Technical Specification Sets The Basis For The Minimum Requirements For Function, Performance, Service Life, Etc. By Confirming The Order, The Relevant Supplier Undertakes To Comply With All Points Of This Document. If The Zd Or Its Annexes Contain Specific Trade Names Or Brands, This Is Only A Definition Of The Required Standard, And The Contracting Authority Allows For Other Technically And Qualitatively Comparable Solutions. 1) Part 1: Colloid Mills And Mixing Equipment The Detailed Technical Specification Of The Subject Of Performance For Part 1 Is Contained In The Annex To The Contract For Part 1 – Technical Specification (Annex No. 1 Of The Contract). 2) Part 2: Fire Roller Shutter The Detailed Technical Specification Of The Subject Of Performance For Part 2 Is Contained In The Annex To The Contract For Part 2 – Technical Specification (Annex No. 1 Of The Contract). 3) Part 3: Air Diaphragm Pumps The Detailed Technical Specification Of The Subject Of Performance For Part 3 Is Contained In The Annex To The Contract For Part 3 – Technical Specification (Annex No. 1 Of The Contract). 4) Part 4: Voc Sensors A Detailed Technical Specification Of The Subject Of Performance For Part 4 Is Contained In The Annex To The Contract For Part 4 – Technical Specification (Annex No. 1 Of The Contract). 5) Part 5: Air Engineering The Detailed Technical Specification Of The Subject Of Performance For Part 5 Is Contained In The Annex To The Contract For Part 5 – Technical Specification (Annex No. 1 Of The Contract). 6) Part 6: Compressed Air Reservoir The Detailed Technical Specification Of The Subject Of Performance For Part 6 Is Contained In The Annex To The Contract For Part 6 – Technical Specification (Annex No. 1 Of The Contract). 7) Part 7: Electrical Installation A Detailed Technical Specification Of The Subject Of Performance For Part 7 Is Contained In The Annex To The Contract For Part 7 – Technical Specification (Annex No. 1 Of The Contract). 8) Part 8: Phase 1 Storage Tank Upgrade A Detailed Technical Specification Of The Subject Of Performance For Part 8 Is Contained In The Annex To The Contract For Part 8 – Technical Specification (Annex No. 1 Of The Contract). 9) Part 9: Phase 2 Storage Tank Upgrade A Detailed Technical Specification Of The Subject Of Performance For Part 9 Is Contained In The Annex To The Contract For Part 9 – Technical Specification (Annex No. 1 Of The Contract). The Contracting Authority Does Not Intend To Discuss Offers With The Participants In The Sense Of Article 5.4 Of The Rules.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 85076226
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.