The Subject Of The Order Is: The Ordering Party Informs That The Order Will Be Implemented On Plots No.: 1709/5, 1712/9, 1712/11, 1714/3, 1715/6, 1715/6, 1715/7, 1715/9, 2862/1 In Rev. 225 Budziwój Ownership Of The Rzeszów City Commune, Including The Improvement Of Infrastructure At The Ks Grunwald Budziwój Stadium In Rzeszów, Including The Following: 1) Construction Of A Club Building With Technical Infrastructure Necessary For The Operation Of The Building. Parameters Determining The Size Of The Club Building: Single-Story Building On A Rectangular Plan, Length 25 M, Width 10 M, Height Of The Building 4.24 M, Building Area: 250 M, Volume: 628.4 M3 Net, 900 M3 Gross, Usable Area: 202, 7M2, Flat Roof. The Building Includes: Internal Water And Sanitary Sewage Installations, Central Heating And Electrical Installations, Photovoltaic, Solar, Alarm And Monitoring Installations, Gravity Ventilation Installation, Construction Of A Water Supply Network To The Hydrant, Reconstruction Of The External Electricity Installation With Installation Of An Electricity Box, Construction Of An External Central Heating System And A Septic Tank For Rainwater, Hardening The Area For Parking Spaces And The Entrance To The Property, Demolition Of Existing Containers And Implementation Of Other Landscaping Elements, Including Sowing Grass After The Works And Tidying Up The Area. The Scope Of The Order Includes White Installation In The Building (Faucets, Sink, Shower Cabins, Kitchen Cabinets, Household Appliances (Stove, Fridge), Equipping Rooms/Sanitary Facilities With Movable Elements, E.G. Mirrors, Toilet Paper Holders, Soap Containers, Towel Hangers, Etc.).2) Construction Of A Fence/Ball Nets And Replacement Of The Surface On The Training Pitch With A Surface Area Of Approx. 2,170 M2 With The Addition Of The Substructure. Panel Fence Of The Pitch On The Western Side Of The Stadium With Ball Catches, 6 M High; Including Three Wickets, 2 Gates (The Main Entrance To The Property, Automatic Sliding, Equipped With An Intercom With Entrance Lighting In The Form Of Led Floodlights, With Motion And Dusk Sensors And A Second Entrance Gate To The Pitch/Manually Opened), Strengthening The Slopes With Concrete Openwork Slabs, Renovation Existing Drainage Channel, Construction Of Field Stairs, Construction Of 2 Benches/Shelters For Players And Construction Of Ball Catchers Between The Pitches (Main And Training) With A Height Of 6 M, Including Strengthening The Slope With The Construction Of Steps From The Pitch To The Slope.3) Construction Of An External Lighting Installation For The Main Pitch With Laying Power Cables To Connect Lighting Lamps, Commissioning The Installation And Monitoring The Facility, And Installing The Scoreboard, Including The Installation Of 8 Lighting Poles With A Height Of Approx. 14 M. Before Starting The Installation Of The Poles On The Eastern Side Of The Pitch, Check The Existing Spacing Of The Mounting Anchors For The Installation Of Poles In 4 Fo
|