General Construction Work For Pipelines – Bc-Cl-16 Rehabilitation And Expansion Of Water Capture, Storage, Transport And Treatment Facilities In Barsanesti, Livezi, Casin And Casin Monastery; Rehabilitation And Expansion Of The Wastewater Transport And Treatment Facilities From The Casin, Casin Monastery And Cotofanesti Agglomerations. Design And Execution Of Works Related To The Contract Bc-Cl-16 Rehabilitation And Expansion Of Water Capture, Storage, Transport And Treatment Facilities In Barsanesti, Livezi, Casin And Casin Monastery; The Rehabilitation And Expansion Of The Wastewater Transport And Treatment Facilities From The Casin, Casin Monastery And Cotofanesti Agglomerations, Including The Detailed Design And Execution Of Civil Constructions, Mechanical And Electrical Installations, Including The Supply And Installation Of Related Equipment, For: • Object 1. Realization Pipelines For Supplying Saa Barsanesti And Saa Livezi. - Section 1: The Intake Pipeline From The Connection Point With The Darmanesti – Targu Ocna Intake, Up To Sp, Peid Pe 100 Rc Pn10 Sdr 17 With Pp Protective Coating, 250 Mm Pn16÷Pn20, L=3,900 M; - Section 2: Peid Pe 100 Rc Pn10 Sdr 17 Adduction Pipe With Pp Protective Coating From Sp To Barsanesti Ga 250 Mm Pn16÷Pn20, L=5,400 M - Section 3: Peid Pe 100 Rc Pn10 Sdr 17 Adduction Pipe With Pp Protective Coating, From Ga Barsanesti To Ga Livezi De180 Mm Pn16÷Pn20, L=12,800 M • Object 2. Barsanesti Water Supply System - New Water House Ga Barsanesti With Chlorination Station Qtr=10.6 L /S And Storage Tank V=800 Mc; • Object 3. Livezi Water Supply System - New Storage Tank With A Capacity Of 600 M3 And Related Hydraulic Installations - New Hypochlorite Chlorination Station With A Capacity Of Qtr = 13.2 L/S - New Operating Pavilion Equipped With: Operators Room, Sanitary Group And Adjacent Septic Tank - Equipping The Adduction And Distribution Pipeline From Ga Livezi With An Electromagnetic Flowmeter And Residual Chlorine Analyzer, Connected To The Scada System. - Equipping The Existing Storage Tanks (2 X V=200M3) With Ultrasonic Level Transducers To Be Picked Up In The Dispatcher Scada System, For Displaying Water Levels And Stocks In The Tanks - Rehabilitation Of The Transport Pipeline From The Water Management To The Distribution Network , The Peid Pe 100 Rc Pn10 Sdr 17 Pipe With Pp Protective Coating, Which Will Have A Diameter Of 180 Mm, Pn 10 And A Length Of Approx. 834 Ml. • Object 4. Casino Water Supply System - Storage Tank With A Capacity Of 200 M3 And Related Hydraulic Installations - Operating Pavilion Composed Of: O Hypochlorite Chlorination Station With A Capacity Of Qtr = 3.2 L/S O Operator Room, Sanitary Group And Adjacent Septic Tank - Equipping The Adduction Pipe And The Distribution Pipe From Ga Casin With Electromagnetic Flowmeters And Residual Chlorine Analyzer, Connected To The Scada System. • Object 5. Casin Monastery Water Supply System The New Works Foreseen In The Existing Casin Monastery Ga Are: - New Storage Tank With A Capacity Of 400 M3 And Related Hydraulic Installations - New Hypochlorite Chlorination Station With A Capacity Of Qtr = 12.4 L/S - Technological And Administrative Building: Operator Room, Scada Center Loc
|