Architectural, Engineering And Planning Services – Werkstattplanung. All Fixtures That Are Permanently Installed Or Connected To Pipes Should Be Planned By The Workshop Planner. Additional Items To Be Planned, Such As: B. Workbenches Or Similar Are Described Separately. For Systems Or Devices Procured By The Hwk For Upper Franconia, The Tga Specialist Planners Are Provided With Appropriate Connection Values And Conditions. Water Connections Or Floor Inlets Are Also Required. For The Individual Workshops, This Is As Follows. 1. Painters Workshop (1X Ground Floor) A Full-Fledged Painting Booth With Floor Suction Must Be Provided. Appropriate Connections Must Be Provided For The Existing Brush Washing Station. A Spray Gun Washing System Needs To Be Re-Planned. Two New Grinding Tables Are Required. 2. Motor Vehicle Workshops (4X Ground Floor) A Central Exhaust Gas Extraction System Must Be Provided For The Four Vehicle Workshops. The Location Of The Ventilation Devices Must Be Provided On The Roof Of The Vehicle Workshops. Rail-Guided Extraction Systems Or Hose Reels Should Be Provided For Each Workshop. Six Vehicle Parking Spaces Are Planned For Each Workshop And Therefore Six Extraction Systems Are To Be Planned For The Different Temperature Ranges. There Is An Additional Parking Space In The Dialog Reception Area. An Exhaust System Is Also Required For This Room. This Means That A Total Of 25 Extraction Points Have To Be Connected To The Central System. A Separate Charging Area/Room Is Required For High-Voltage Batteries. Likewise Hazardous Substance Cabinets With Exhaust Air. The Exact Quantities Of Hazardous Substances To Be Stored Are Specified By The Hwk. 3. Metal/Welding Workshop (1X Ground Floor) 12 Welding Cabins (Approx. 2.0 X 2.25 M) And 1 Teachers Station Are To Be Built In The “Black Welding Workshop”. The Welding Cabins And The Teachers Station Should Be Equipped With Solid, Soundproof Partitions And A Welding Slat Curtain (Red) For Access. The Teachers Station Does Not Require A Cabin. Furthermore, Each Cabin Has The Following Equipment: - Electrical Distributor With 1X 32A And 1X 16A Cee Socket As Well As 3 X 230V Schuko Sockets, And Compressed Air; - Extraction Arm With Lighting The Following Is Required For The Stainless Steel Welding Workshop Workshop: - Six Welding Stations With The Same Structure As The Black Welding Workshop, But Without Enclosures With Welding Cabins. The Individual Welding Stations Are Separated With Mobile Soundproof Walls (Approx. 2.00 X 2.10 M). No Welding Slat Curtains Are Required. In The “Grinding Machine” Room, 4 Grinding Tables With Extraction Are Required. The “Central Warehouse” Room Has A Flame Cutting Table With Extraction. The Above Extraction For The Individual Workshops And Rooms Should Be Carried Out Via A Central Extraction System. This Should Be Placed On The Ground Floor At The Front Of The Workshop Halls. Filters And Spark Pre-Separators Must Be Taken Into Account. 4. Workshops Construction (4 X Ground Floor) The Machine Room In Building 1/2 Will Have A Mobile Chip Extraction System For The Processing Machines Stationed There. Construction 1 Is Assigned To The “Tile Work” Trade
Contact Information
Contact No.
+49 921910173
Email
tino.barnickel@hwk-oberfranken.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 84647057
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.