Removal Of Leachate Will In Normal Operation Be During The Opening Hours Of The Facility. This Will Be From 8.00 Am To 4.30 Pm Monday To Friday. Discharge From Tankers At The Designated Waste Water Treatment Plant(Wwtp) Will Be By Drip Feed And The Contractor Will Require One Additional 30M3 Tanker To Meet This Requirement. Typical Daily Volumes Of Leachate To Be Removed From Site Is 60 M3. The Volumes To Be Removed Are Dependent On Acceptance At The Waste Water Treatment Plant And Volumes Produced On Site. The Proposed Date For The Commencement Of The Contract Is The 1St Of December 2024.