Tender For Replacement Of Defective Spares And Accessories Of One Number Pump At New Park Bps., 1 Supply Of ... in India
Tender Notice
TenderID
84482544
Tender Brief
Tender For Replacement Of Defective Spares And Accessories Of One Number Pump At New Park Bps., 1 Supply Of Sleeves Of Pump Model No.20Uph3m1(Dv) Kirloskar Brothers Ltd. Make 2 Supply Of Sleeves Nut Rh Of Pump Model No.20Uph3m1(Dv) Kirloskar Brothers
Tender For Replacement Of Defective Spares And Accessories Of One Number Pump At New Park Bps., 1 SUPPLY OF SLEEVES OF PUMP MODEL NO.20UPH3M1(DV) KIRLOSKAR BROTHERS LTD. MAKE 2 SUPPLY OF SLEEVES NUT RH OF PUMP MODEL NO.20UPH3M1(DV) KIRLOSKAR BROTHERS LTD. MAKE 3 SUPPLY OF SLEEVES NUT LH OF PUMP MODEL NO.20UPH3M1(DV) KIRLOSKAR BROTHERS LTD. MAKE 4 SUPPLY OF SLEEVES LOCK NUT RH OF PUMP MODEL NO.20UPH3M1(DV) KIRLOSKAR BROTHERS LTD. MAKE 5 SUPPLY OF SLEEVES LOCK NUT LH OF PUMP MODEL NO.20UPH3M1(DV) KIRLOSKAR BROTHERS LTD. MAKE 6 REMOVAL OF SLEEVE BUSHES / STUFFING BOX BUSH / JAM NUTS ETC FROM THE SHAFT WITH REQUIRED ARRANGEMENT ETC. COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. (MODE OF MEASUREMENT- WEIGHT OF SLEEVES / JAM NUTS / STUFFING BOX BUSH ETC WITH SHAFT) 7 TAKEN OUT OF THE SHAFT-IMPELLER ASSEMBLY FROM THE BOTTOM VOLUTE OF THE HT PUMP AND KEPT ON THE PEDESTAL WITH CARE & CAUTION & COMPLETE AS PER DIRECTION OF EIC (MODE OF MEASUREMENT-WEIGHT OF IMPELLER, SHAFT, SLEEVE, JAM NUT & HALF COUPLING) 8 DE-ASSEMBLING OF THE BUSH BEARING BOTH IN DE & NDE WITH UTMOST CARE BY USING DEPARTMENTAL OVERHEAD CRANE AND PLACING THE BUSH BEARING ETC. ON THE PUMP HOUSE WORKING FLOOR & COMPLETE IN ALL RESPECT AS PER DIRECTION EIC (MODE OF MEASUREMENT -ENTIRE INTERNAL SURFACE AREA OF THE WHITE METAL OF THE BEARING) 9 TO & FRO TRTANSPORTATION OF COMPLETE SHAFT-IMPELLER ASSEMBLY FROM PUMP HOUSE WORK SITE TO THE CONTACRTOR"S WORK SHOP AND VICE VERSA INCLUDING LOADING AND UNLOADING WITH PROPER CARE AS PER DIRECTION OF EIC(MODE OF MEASUREMENT- WEIGHT OF IMPELLER, SHAFT, SLEEVE, JAM NUT & HALF COUPLING 10 FITTING & FIXING OF THE SLEEVE / JAM NUTS / STUFFING BOX BUSH/ WEARING RING BY HYDRAULIC JACK & SPECILIZED FIXUTURES ETC. & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.(MODE OF MEASUREMENT - WEIGHT OF THE SLEEVES / JAM NUTS / STUFFING BOX BUSH / WEARING RING WITH SHAFT 11 POSITIONING, FITTING & FIXING THE COMPLETE ROTATING ASSEMBLY ON THE PUMP BOTTOM VOLUTE WITH ALL SEQUENTIAL PROCEEDINGS AND KEEPING UTMOST CARE & CAUTION AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.(MODE OF MEASUREMENT-WIGHT OF IMPELLER, SHAFT, SLEEVE, JAM NUT & HALF COUPLING) 12 DE-COUPLING OF THE HT PUMP FROM DRIVE MOTOR BY REMOVING THE COUPLING BOLTS ETC. WITH CARE & CAUTION AND KEPT THE COUPLING BOLTS IN THE DEPARTMENTAL GODOWN & COMPLETE AS PER DIRECTION OF EIC (MODE OF MEASUREMENT-DRIVE MOTOR WATT*NO OF POLES/RPM) 13 REMOVAL OF HORIZONTAL/VERTICAL SPLIT TOP VOLUTEAFTER LOOSENING THE NUTS & BOLTS FROM THE BOTTOM VOLUTE OF THE HT PUMP WITH UTMOST CARE BY USING DEPARTMENTAL OVERHEAD CRANE & KEEP THE TOP VOLUTE AT THE WORKING FLOOR AND AFTER COMPLETION OF THE NECESSARY INSPECTION/WORKS ETC & GAIN PLACING THE TOP VOLUTE ON THE BOTTOM VOLUTE WITH NECESSARYHYDRAULIC PAPER ETC ALONG WITH THE SEALING OF BOTH NDE & DE SIDE OF VOLUTE CASING TO PREVENT SUCKING OF AIR & BOLTED UP OF THE TOP BOTTOM VOLUTE CASING & COMPLETE AS PER DIRECTION OF EIC.(MODE OF MEASUREMENT-DRIVE MOTOR WATT*NO OF POLES/RPM) 14 REMOVAL OF HALF COUPLING USING THE HYDRAULLIC PULLER & FIXTURES ETC. VERY CAUTIOUSLY FROM THE SHAFT AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.(MODE OF MEASUREMENT-DRIVE MOTOR WATTXNO OF POLES/RPM) 15 FITTING & FIXING OF THE HALF COUPLING BY HYDRAULLIC JACK & SPECILIZED FIXTURES ETC. & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.(MODEOF MEASUREMENT-DRIVE MOTOR WATTXNO OF POLES/RPM) 16 MAKING ALIGNMENT OF THE SHAFTS OF PUMP & MOTOR BY USING DIAL GAUGE ETC, INCLUDING INSERTION OF REQUISTE DIMENTIONAL BRASS SHEETES & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.(MODE OF MEASUREMENT-WATTAGE OF THE DRIVE MOTORXNO OF POLES/RPM) 17 MAKING COUPLING THE HT PUMP WITH THE DRIVE MOTOR BY INSERTION THE COUPLING PINS ETC. WITH CARE & CAUTION AND COMPLETE AS PER DIRECTION OF EIC (MODE OF MEASUREMENT-DRIVE MOTOR WATT*NO OF POLES/RPM) 18 COMMISSIONING THE HT PUMP WITH DRIVE MOTOR WITH SEQUENTIAL PROCESS WITH PROPER CARE & CAUTION & DO NEEDFUL OBSERVATION FOR TRIAL RUN TO ACIEVE THE SATISFACTORY OPERATION OF THE PUMP & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.(MODE OF MEASUREMENT-PER DAY BASIS) 19 SUPPLY OF CASING WEAR RING OF PUMP MODEL NO.20UPH3M1(DV) KIRLOSKAR BROTHERS LTD. MAKE 20 Estimated amount 21 Add: 9%CGST 22 Add: 9%SGST 23 Add: 1% LW Cess
Contact Information
Contact Person
Executive Engineer (TPS)
Address
Office of The Ex.Engr. (E)/TPS (Water Supply), 71 B.T. Road, Kolkata-700002
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 84482544
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.