Tenders Are Invited For Electricity – Ao Relating To The Construction And Operation Of Electricity Productio ... in France
Tender Notice
TenderID
84359341
Tender Brief
Tenders Are Invited For Electricity – Ao Relating To The Construction And Operation Of Electricity Production Facilities From Photovoltaic Solar, Hydroelectric Or Wind Energy Located In Continental Metropolitan Areas
Electricity – Ao Relating To The Construction And Operation Of Electricity Production Facilities From Photovoltaic Solar, Hydroelectric Or Wind Energy Located In Continental Metropolitan Areas. Facilities Not Eligible For A Purchase Contract Taken Pursuant To A Decree Mentioned In Article R. 314-12 Of The Energy Code And Which Are: — Photovoltaic Installations In The Ground, Or; — Photovoltaic Installations On Buildings, Greenhouses, Sheds Or Shade Houses (Referred To As “Photovoltaic Installations On Buildings” In The Following), Or; — Hydroelectric Installations, Or; — Wind Turbine Installations. For Ground-Mounted Photovoltaic Installations, An Additional Condition Of Eligibility For This Call For Tenders Is That Their Power Is Between 500 Kwp And 30 Mwp For Projects On Land Corresponding To Cases 1 And 2 Of Paragraph 2.6 Of The Specifications And Strictly Greater Than 500 Kwp For Projects On Land Corresponding To Case 3 Of Paragraph 2.6 Of The Specifications. For Photovoltaic Installations On Buildings, Installations With Peak Power Strictly Greater Than 500 Kwp Are Eligible. For Hydroelectric Installations, An Additional Condition Of Eligibility For This Call For Tenders Is That The Installations Are New Installations, With An Installed Power Greater Than Or Equal To 1 Mw, Which Are Not Subject To The Hydraulic Concessions Regime In Application. Of Article L. 511-5 Of The Energy Code, Nor Included In The Scope Of An Existing Hydraulic Concession, And Correspond To One Of The Following Two Families: 1. Family 1: Installations Located On New Sites, Installed Power Greater Than Or Equal To 1 Mw Installations Eligible For This Family Are Installations Meeting All Of The Following Conditions: — New Hydroelectric Installations With New Water Intake Structures; — Installations Not Providing For Any Operation Of Water Intake Structures Located On Sections Of Watercourses Classified In The List Mentioned In 1O Of I Of Article L. 214-17 Of The Environmental Code; 2. Family 2: Installations Equipping Existing Thresholds, With Installed Power Greater Than Or Equal To 1 Mw Installations Eligible For This Family Are Installations Meeting All Of The Following Conditions: — New Hydroelectric Installations With Water Intake Structures Existing; — When The Installation Is Located On Watercourses Classified In The Lists Mentioned In 1O Of I. Of Article L. 214-17 Of The Environmental Code, Installations With Fish-Compatible Turbines, Or It Has Been Demonstrated That Such Turbines Cannot Be Installed In Fish-Compatible Water Intakes. The Cumulative Power Demand Is Divided Into Application Periods, Spanning Five Years.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 84359341
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.