Electrical Installation Work – 24S30536 - Wilhelmshaven Naval Base, New Service Building - Electrical Work. Electrical Work The Intention Is To Build 3 Office Buildings. Attached Is The List Of The Essential Dimensions For 1 Building: 1 Photovoltaic System, Approx. 70 Kwp, 1 Main Building Distribution, 10 Sub-Distribution, Approx. 500 M Cable Nycwy 4X16/16 To 4X25/16 Mm², Approx. 3,500 M Cable Nyy-J 1X6 To 1X16 Mm², Approx. 22,000 M Cable Nym-J 3X1.5 To 5X2.5 Mm², Approx. 160 M Cable Tray 300-500 Mm, Approx. 270 M Mesh Tray 300-500 Mm, Approx. 90 M Cable Ladder 300-500 Mm, Approx. 550 M Parapet Duct 170/90 Mm, Approx. 280 M Underfloor Duct 350 Mm, Approx. 85 Pieces. Installation Or Pull Tank For Underfloor Duct, Approx. 2,200 Pcs. Collective Fastenings/Metal Collector Holders, Approx. 450 M Installation Pipe , Approx. 150 Pcs. Fire Barrier, Approx. 2,050 Pcs. Sockets/Switches, Approx. 100 Pcs. Knx Buttons, Approx. 60 Pcs. Motion Detectors, Approx. 100 Pcs. Knx Presence Detectors, Approx. 450 Pcs. Built-In Or Insert Lights, Approx. 120 Pieces. Surface-Mounted Lights, Approx. 15 Pieces. Knx Blind Actuator, 1 Piece. Central Battery For Safety Lighting System / 30 Circuits, 1 Piece. Sub-Central Safety Lighting Center, Approx. 125 Pieces. Safety Light Or Escape Sign Light, 4 Pieces. Data Distribution Cabinet 42U, Approx. 19 Pieces Patch Panels 24 Ports, Cat6a, Approx. 8 Pieces Patch Field Lwl 6-12 Scd, Approx. 220 Pieces Double Data Socket Cat6a, Approx. 25,000 M Data Line Cat7, Approx. 30 Pieces 2Xscd Fiber Optic Connection Box, Approx . 1,100 M Fiber Optic Cable 4G50/125, Approx. 10 Outdoor Bollard Lights
|