Medium-Voltage Installation Work – Modernization Of Distribution Networks In Geoagiu City, Geoagiu Bai And The Localities: Aurel Vlaicu, Bozes, Cigmau, Homorod, Mermezeu-Valeni, Renghet, Poienari And Valeni. The Purchase Of The Works Is Necessary To Improve The Quality Of The Electricity Distribution Service, Reduce The Risk Of Accidents, Comply With The Requirements Established By The Anre Performance Standard Regarding Continuity In The Supply Of Electricity To Consumers. These Aspects Have A Direct Influence On Losses From The Network As Well As On Individual Consumption At The Level Of Homes And Therefore Will Lead To A Lower Local Footprint Of Carbon Dioxide. It Is Proposed To Modernize The Technically Outdated Installations With New, High-Performance Installations. The Project Area Was Delimited By The Service Area Of The 22 Pts Where The Distribution Network Modernization Works And The 5 Mv Cable Routes Will Be Executed. This Area Is Distributed Within The Radius Of The City Of Geoagiu, According To The Attached Situation Plan, In The Localities Of Aurel Vlaicu, Renghet, Bozes, Cigmau, Valeni, Homorod Joseni, Homorod Suseni, Poienari. The Location: The Project Area Is Located In The Suburbs Of The Geoagiu Locality On Land Belonging To The Public Or Private Domain. The Modernized Lines, Designed 20 Kv Les Type, Will Be Laid On Routes On Local Roads, According To The Attached Situation Plan 1. The Present Project Aims To Move The Distribution, Medium Voltage, To A Higher Level, By Making Some Lines Looped, Consisting Of 20 Kv Cables, Between Lea 20Kv Imo - Zavoi Derivation Cigmau And Ptab 2037 Existing Sanatorium, Between Lea 20Kv Orastie Fnc Stp. 51B Designed And Lea 20Kv Orastie Balomir Deriv. Curechi Stp. 14B Designed, Between Lea 20Kv Orastie Balomir Stp. 16 Derivation Ptz 2086 And Lea 20Kv Orastie Fnc Derivation Renghet (Cetrj Mina) Stp. No. 6A Designed, The Transition From Lea To Les Of Lea 20Kv Orastie Balomir, Aurel Vlaicu Derivation And Homorod Derivation, To Which 24 Transformer Substations Will Be Connected, After Redesign/Reconfiguration, Which, In Turn, Will Be Modernized. 2. The Transformer Substations Included In The Area Of Applicability Of The Project, Located Within The Radius Of The City Of Geoagiu, And Which Are The Subject Of This Documentation, Are Aerial Substations, Most Of The Equipment Having Their Lifespan Exceeded For A Long Time, I.E. They Have More Than 40 Years Of Operation. 3. The Jt Network Will Be Modernized By Replacing Non-Insulated Conductors With Twisted Insulated Conductors And Replacing Damaged Poles, The Works Will Be Carried Out In The Area Of The City Of Geoagiu, Geoagiu Bai, The Localities Of Aurel Vlaicu, Renghet, Bozes, Cigmau, Valeni, Homorod Joseni, Homorod Suseni, Meadows. 4. Construction Of New Underground Power Lines, With A Nominal Voltage Of 20 Kv (At Mt), Between The Newly Designed Ptabs And The Existing Ptz, On Which Modernized Pts Will Be Integrated, With Superior Performance From The Point Of View Of Continuity Of Service (Fewer Interruptions And Shorter Durations) And Quality Of Service (Lower Technical Losses And Voltage Supplied To Consumers Maintained Within Nominal Parameters, Indif
|