Earthmoving Work – Earthworks And Civil Engineering Work. Earthworks And Civil Engineering Work Schwaigweg 1 / Am Dorfbach 15•Construction Site Equipment, Be Planning•Produce, Maintain, Remove Construction Fence Including Gate, Approx. 90M•Obtain Permits•Construction Electricity And Construction Water Connection•Documentation•Construction Rubble, Mixed And Unmixed, Total Approx. 30 To•Produce, Maintain, Dismantle Construction Board, 1 Piece•Produce Open Dewatering•Be Facility, Shoring Work, Equipment•Static Calculation, Measurement Work•Supply, Install, Maintain And Pull Steel Sheet Piles, Approx. 7 Ton Sheet Piles, Shoring Approx. 84M2• Pull Shoring, Including Building Supports And Embankment Ramp•Measuring The Construction Pit•Creating A Search Trench, Securing Compartments And Lines, 4 Pieces.•Excavating Topsoil, Homogeneous Area O.1, Approx. 330M3•Excavating Soil And Filling, Homogeneous Area E1, Approx. 850M3•Excavating Soil And Gravel, Homogeneous Areas E2, Approx. 1,520M3•Additional Rock, Homogeneous Area B2, Approx. 50M3•Form Heaps, 16 Pieces Of Max. 250M3•Store Heaps For Sampling, 16 Pieces.•Disposal Of Excavated Mass Z0, Approx. 1330M3•Disposal Of Excavated Mass Z1.1, Approx. 270M3 • Disposal Of Excavated Mass Z1.2, Approx. 270M3 • Disposal Of Excavated Mass Z2, Approx. 230M3 • Allowance For Disposal Dk0 And Dk1 • Reinstall Uncontaminated Material, Approx. 300M3 • Secure Embankment, Approx. 270M2 • Create Embankment Stairs •Produce Bedding Cushion, Under The Existing Floor Slab, Floor Slab, Foundations, Approx. 180M3 •Fill The Work Space, Approx. 20M3 •Fill The Foundation Gap, Approx. 20M3 •Compact The Base Of The Construction Pit, Fine Leveling, Approx. 480M2 •Static Load-Bearing Capacity Test, 5 Pcs. •Produce Drainage, Total Approx. 110M Of Piping•Insert Filter Fleece, Geotextile, Approx. 400M2•Install Gravel, Compact, Seepage Pack, Approx. 80M3•Set Flushing And Control Shafts, 7 Pieces.•Manhole Covers, 7 Pieces•Transfer Shaft, Including Manhole Cover, 1 Piece. •Director Hours, Wages And Equipment
|