Concrete Work – Blb Nrw D/Wuppertal (We1387)/D-Jva W-Voh New Building Prov. Gate/Ve004 Institution Wall 065-24-00239. Topsoil Removal Approx. 100 M3 Loosen Soil, Convey It, Store It, Remove It With Hand/Device Dispose Of Approx. 320 M3 Earth Material, Non-Hazardous Approx. 225 M3 Disposal Earth Material, Enforce Building Rubble 50% Approx. 35 T Earth Material, Deliver And Install Approx. 195 M3 Gravel/Grit/Crushed Sand Mixture 0/45, Supply And Install Approx. 200 M3 Substructure Of Lean Concrete Wedges, Step 30°, Clean Layer, Up To W16/20 Approx. 60 M3 Wall Elements, H = 8.0 - 9.0 M, Sb2, C35/45, Xc4, Reinforced (17 Pcs) 60 M3 Wall Elements, Store 103 Pcs Wall Elements With Low-Shrinkage Mortar, C20/25, According To Wall Heights Approx. 400 M Fill Element External Joint, 1K Polymer Outdoor Area, Resistant -40 To 80°C Approx. 650 M Reinforcing Steel Bst500s/M For All Elements, Up To 9.0 M, Bst 500 S/M Din 488 Approx. 30 T Prov. Wall Elements With Base, H Up To 8.0 M, Sb2, C35/45, Xc4, Wall Elements With Base, H Up To 7.0 M, Sb2, C35/45, Xc4, Wall Elements With Base, H Up To 6.0 M, Sb2, C35/45, Xc4, , Existing Walls, Buildings, Containers, Corners Approx. 600 M2 Structural Steel Profiles Of Various Cross Sections For Substructures, Galvanized Approx. 1.5 T Demolition And Disposal Prov. Wall Elements, H Up To 7 M, Stb, Reinforced, D = 22 Cm, L Up To 2 .5 M, C35/45, Including Joint Grouting, Sheet Metal 27 Pieces. Demolition Of Concrete Layers/Foundations Made Of In-Situ Concrete Up To C20/25 Approx. 30 M3
|