Manual Excavation For Crowning Block Or Footing, Concreting Footings Fck 30Mpa, Manufacture Of Form P Pillars And Similar Structures In Wood, Assembly And Dismantling Of Beam Form In Sawn Wood, Concrete Fck 25Mpa Traco 1 2 3 2 7 Cement Sand Media Brita Mechanical Preparation With 400L Concrete Mixer, Surface Cleaning With High Pressure Jet. Af 04 2019, Block Frame And Footing Using 25Mm Ca 50 Steel, Mechanical Compaction Of Soil For Execution Of Radier With Compactor, Concreting Of Radier Floor Or Slab On Soil Fck 30 Mpa, Execution Of Radier Thickness Of 10Cm Fck 30Mpa, Subfloor In Traco Mortar 1 4 Cement And Sand 5Cm Regularization, Demolition Of Simple Concrete Floor Manually, Repair With Wrenches C Irons With Bar 5 16, Repair Of Cracks With Cement And Sand Mortar, Ceramic Floor Coating 60X60, Ceramic Coating For Walls Internal 20X20, Ceramic Floor Cleaning Using Acid, Ceramic Wall Covering Cleaning Using Muriatic Acid, Demolition Of Ceramic Covering Manually, Demolition Of Ceramic Wall Covering Manually, Toilet Bowl With Attached Box, Cold Water Terminal Consumption Point Sub-Branch With Dn 25 Mm Pvc Piping Installed In Water Branch Including Tear And Anchoring In Masonry., White Louca Washbasin C Column 44 Precast Concrete Sewer Internal Diameter 0 6M Depth 1 5M Excluding Cover, Connections For Sewage Networks, Circular Concrete Drainage Internal Diameter 1 88M, Precast Concrete Circular Septic Tank D 1 88 Height 2 50M Volume 6245 8 L, Building Sewer Dn 100Mm Supply And Installation, Pvc Pipe Normal Series Building Sewer Dn 50Mm Supplied And Installed In Discharge Branch Or Sanitary Sewer Branch, Angle Iron 5 8 , Screw With Gauge 8Mm Of Angle Iron 5 8, Matte Black Enamel Painting Of Angle Iron, Standard Acrylic Latex Paint Manual Application On Walls 2 Coats, 3X3 Mesh Protection Net Anti Birds Doves 10 00X2 00M, Production Of Metalon Angle Structure 40X40, Execution And Installation Of The Railing Height Of 50Cm, Sanding And Polishing Of Parquet, Painting With Cetol Non-Slip Deck 2 Coats, Painting Of The Demarcation Of The Multi-Sports Court With Acrylic Paint, Galvanized Steel Railing 1 10M High, Perimeter Painting Of The Court With Epoxy Paint Surroundings, Assembly And Disassembly Of Tower Type Tubular Scaffolding, Installation Of Smooth Colorless Glass And 3Mm In Aluminum Frame, Closing Of Roof Holes With Uv Polyurethane, Cleaning Of The Sports Court With A Dry Broom, Cleaning Of Ceramic Floors Using Detergent, Cleaning Of Ceramic Coating On Wall Using Detergent, Cleaning Of Glass Window With Steel Frame, Manual Cleaning Of Vegetation On The Ground Using A Hoe, Rubble In A 6M3 Tipper, 1 Painting With Alkyd Background Paint Type Zarcao Applied By Roller Or Brush On Metallic Profile Made In Factory By Demao
|