1.1. Location Of Work With Template Of Boards Pointed Every 2.00M, Reuse (2X), Including Monitoring Of Topographic Team To Mark Topographic Point, 2.1. Manual Excavation For Crown Block Or Footing (Including Excavation For Placing Formwork). Af_06/2017, 2.2. Manual Excavation For Baldrame Beam Or Running Footing (Including Excavation For Placing Formwork). Af_01/2024, 2.3. Preparation Of The Bottom Of A Trench With A Width Of Less Than 1.5 M (Natural Soil Adjustment). Af_08/2020, 2.4. Manual Trench Backfilling, With Vibrating Plate. Af_08/2023, 3.1.1. Slim Concrete Ballast, Applied To Floors Or Radiators. Af_08/2017, 3.1.2. Formwork And Formwork For Girder/Block With Board And Batten, Reuse (3X) (Foundation), 3.1.3. Concrete Fck = 25Mpa, Mixture 1:2, 3:2, 7 (In Dry Mass Of Cement/Medium Sand/Gravel 1) - Mechanical Preparation With 400 L Concrete Mixer. Af_05/2021, 3.1.4. Cutting And Bending Of Ca-60 Steel, Diameter Of 5.0 Mm. Af_06/2022, 3.1.5. Cutting And Bending Ca-50 Steel, Diameter 10, 3.2.1. Forming And Demoulding Of Resin Plywood, Esp. 10Mm, Reuse (3X), Exclusive Shoring, 3.2.2. Concrete Fck = 25Mpa, 3.2.3. Ca-60 Steel Cutting And Bending, 3.2.4. Ca-50 Steel Cutting And Bending, 3.3.1. Formwork And Deformation Of Resin Plywood, 3.3.2. Concrete Fck = 25Mpa, 3.3.3. Ca-60 Steel Cutting And Bending, 3.3.5. Ca-50 Steel Cutting And Bending, 3.4.1. Plasterboard Lining, For Residential Environments. Af_08/2023_Ps, 3.5.1. Surface Waterproofing With Asphalt Emulsion, 2 Coats. Af_09/2023, 4.1. Concrete Block Masonry Filled With Frame, In Concrete With Fck 15Mpa, Esp. 14Cm, For Cladding, Including Mortar For Laying, 4.2. Fence Masonry With Perforated Ceramic Brick, 14Cm Wide, 4.4. Chapisco Applied To Masonry And Internal Concrete Structures, Using A Trowel. Mortar Trace 1:3 With Manual Preparation. Af_10/2022, 4.7. Plastering With Mortar, Ratio 1:2:8 (Cement, Lime And Sand), Esp. 20Mm, Manual Application, Including Mortar With Mechanized Preparation, Exclusive Chapisco, 4.8. Preparation For Plastering Or Painting (Latex/Acrylic) On The Wall, Including One (1) Coat Of Acrylic Sealer, 5.1. Subfloor Leveled With Mortar, Ratio 1:3 (Cement And Sand), 5.2. Ceramic Floor Coating With Extra Enamelled Plates Of Dimensions 35X35 Cm Applied In Rooms With An Area Larger Than 10 M2. Af_02/2023_Pe., 5.3. Ceramic Plinth Measuring 7Cm High With Commercial Enamelled Plates Measuring 35X35cm (Popular Standard). Af_02/2023, 5.4. Ceramic Floor Coating With Extra Enamelled Plates Of Dimensions 35X35 Cm Applied In Rooms With An Area Larger Than 10 M2. Af_02/2023_Pe, 5.5. Application Of Epoxy Grout For Wall/Floor Coverings With Joints Up To 3Mm Thick, 6.1. Steel Mesh Composed Of Purlins For Roofs Of Up To 2 Pitches For Fibercement, Metallic, Plastic Or Thermoacoustic Corrugated Tile, Vertical Transport Included. Af_07/2019, 6.2. Roofing With Steel/Aluminum Tile E = 0.5 Mm, With Up To 2 Waters, Including Lifting. Af_07/2019, 6.3. Flashing In Galvanized Steel Sheet Number 24, 25 Cm Cut, 6.4. Galvanized Steel Sheet Gutter Number 24, 50 Cm Development, 6.5. Manual Removal Of Crate For Ceramic Or Concrete Tile, Including Spacing And Stacking, Excluding Transportation And Removal Of Non-Reusable Removed Material, 6.6. Manual Removal Of Ceramic Tile, With Reuse, Exclusive Transport And Removal Of Remo Material
|